May 20, 2024 at 6:00 PM - Omaha Public Schools Board of Education and Educational Service Unit 19 Board Meeting
Agenda | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A. OPS Board Of Education Information
Rationale:
Notice to visitors: If you wish to speak, please obtain a “Request to be Heard” form from the entry table and return the completed form to the table attendant or the Board of Education Director. The agenda will be kept current and available for public inspection in the office of the Secretary of the Board of Education at the Administrative Building during regular working hours. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B. Call to Order
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
C. Pledge of Allegiance
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D. OPS Vision and Mission Statement
Rationale:
The Vision: Every Student. Every Day. Prepared for Success.
The Mission: To prepare all students for success in college, career, and life. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
E. Roll Call
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
E.1. Excused/Unexcused Absence
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
F. School Spotlight
Rationale:
The #OPSProud Spotlight celebrates students and staff throughout Omaha Public Schools who earned statewide recognition and leadership posts in Educators Rising.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
G. Board and Superintendent Communications
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
G.1. Superintendent
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
G.2. Board Members
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
H. Public Comment and Recognition
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I. Consent Agenda
Rationale:
At this time, any Board member may request that any item in the consent agenda be removed from the consent agenda and be considered and voted on separately.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.1. Reading of Minutes
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.1.a. Monday, May 6, 2024 - Regular Meeting
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.2. Approval of the Agreement with Leading Educators to Provide Professional Development Training and Assistance as Part of the Title I Comprehensive Support and Improvement (CSI) Grant and Instructional Materials Implementation ($1,373,799.00)
Rationale:
FUND: 1 General Fund, 174 Title 1003A
PROGRAM: 2212 Instructional Staff Support, 1100 Regular Instruction DEPT: 7193020, CSI Schools Dept POLICIES: 7000, III. K., 7000, VII. A AMOUNT: $1,373, 799.00 ($49,310.00 general fund, $1,324,489.50 Title 1003A) Administration recommends approval of the attached agreement with Leading Educators to provide professional development training and assistance as part of the Comprehensive Support and Improvement (CSI) Grant and implementation of recently adopted secondary English Language Arts curriculum. The CSI Grant is offered by the Nebraska Department of Education's (NDE) Accountability System (AQuESTT) to identified schools that need additional strategic instructional support. CSI designated schools submit a continuous improvement plan to be approved by NDE. As part of the various plans, the District and NDE have agreed that the District will provide additional professional development. The District will partner with Leading Educators to provide professional development to CSI designated schools listed below and technical assistance for curriculum implementation beginning July 1, 2024 and ending June 30, 2025. The total amount of this agreement is $1,373,799.50. Some will be paid by general fund and some by Title 1003A (Comprehensive Support and Improvement (CSI) funding.) The following schools are CSI designated schools: Adams Elementary Alfonza Davis Middle Bancroft Elementary Beals Elementary Belvedere Elementary Benson High Benson West Elementary Beveridge Middle Bryan Middle Central Park Elementary Chandler View Elementary Conestoga Elementary Field Club Elementary Florence Elementary Fontenelle Elementary Gateway Elementary Highland Elementary Indian Hill Elementary Jackson Elementary King Elementary King Science Middle Lewis and Clark Middle Liberty Elementary Lothrop Elementary McMillan Middle Minne Lusa Elementary Monroe Middle Morton Middle Mount View Elementary Nathan Hale Middle Norris Middle RM Marrs Middle Skinner Elementary South High Spring Lake Elementary Wakonda Elementary Walnut Hill Elementary
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.3. Approval of the Title I Comprehensive School Improvement (CSI) and CSI-Additional Targeted Support and Improvement (ATSI-CSI) Grant Allocation from May 20, 2024, to September 30, 2025
Rationale:
Policy: 6410
The Comprehensive Support and Improvement (CSI) Grant is offered to identified schools that need additional strategic instructional support as per the Nebraska Department of Education's (NDE) Accountability System (AQuESTT). It is required for all CSI designated schools to submit a continuous improvement plan and application that aligns with the District’s Strategic Plan to be approved by NDE. The NDE Office of Federal Programs, Coordinated Schools, and the District have collaborated to provide CSI schools with targeted, customized support in developing and implementing their plans. The Title I Comprehensive School Improvement (CSI) and CSI-Additional Targeted Support and Improvement (ATSI-CSI) Grant Allocation amount is $2,521,386.00 for the period beginning May 20, 2024, and ending September 30, 2025. The schools receiving the grant are: Adams Elementary Alfonza Davis Middle Bancroft Elementary Beals Elementary Belvedere Elementary Benson High Benson West Elementary Beveridge Middle Bryan Middle Central Park Elementary Chandler View Elementary Conestoga Elementary Field Club Elementary Florence Elementary Fontenelle Elementary Gateway Elementary Highland Elementary Indian Hill Elementary Jackson Elementary King Elementary King Science Middle Lewis and Clark Middle Liberty Elementary Lothrop Elementary McMillan Middle Minne Lusa Elementary Monroe Middle Morton Middle Mount View Elementary Nathan Hale Middle Norris Middle RM Marrs Middle Skinner Elementary South High Spring Lake Elementary Wakonda Elementary Walnut Hill Elementary |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.4. Approval to Award Bid No. 24-042 to Government Goods, Inc. and Riverside Technologies, Inc. for the Purchase of One Thousand Six Hundred Twenty (1,620) Student Laptops, One Hundred Ninety (190) Staff Laptops, and One Hundred Ninety (190) Docking Stations for District Technology Needs ($1,455,760.00)
Rationale:
FUND: 1 & 175 General Fund and COVID Federal Grants
PROGRAM: 1100 Regular Instruction DEPT: 7062560 Districtwide Technology PROJECT: 499254 Technology Tools SUPPLIER: Pending Government Goods, Inc. $1,286,280.00 SUPPLIER: 26608 Riverside Technologies, Inc. $169,480.00 POLICIES: 7000, VII. A. AMOUNT: $1,455,760.00 Administration recommends approval of Bid No. 24-042 to Government Goods, Inc. to purchase one thousand six hundred twenty (1620) Student Laptops, and Riverside Technologies, Inc, to purchase one hundred ninety (190) Staff Laptops, and one hundred ninety (190) Docking Stations for students and staff at Benson High, Bryan High, Buena Vista High, Burke High, Central High, North High, Northwest High, South High, Westview High, Beveridge Middle, Bluestem Middle, Bryan Middle, Buffett Middle, Davis Middle, Hale Middle, King Science Center, Lewis & Clark Middle, Marrs Middle, McMillan Middle, Monroe Middle, Morton Middle, and Norris Middle schools. This purchase is part of our Academic Recovery and Acceleration Support initiative, using ESSER funds under Pillar I. The District received seventeen (17) bid responses, of which ten (10) were non-compliant. Planet Holding, Inc. is non-compliant for not having a signed signature page. AITA Technologies, Apex OmniSource, LLC, Archangel Technology, LLC, Frontier Technology, LLC, and Striv AV are non-compliant for failure to acknowledge Addendum 1. Malor & Company, Inc. and Southern Computer Warehouse are non-compliant for not providing the required specification paperwork. The Repair Depot, LLC is non-compliant for failure to provide RAM specifications, and Wisecom Technologies, Inc. for failure to provide a 3-year warranty as specified in the bid. Government Goods, Inc. is awarded Student Laptops as low bidder, and Riverside Technologies, Inc. has been awarded as low bidder for Staff Laptops and Docking Stations. These allow the students' devices to run CAD and Adobe products more efficiently. Government Goods, Inc. and Riverside Technologies, Inc. are the responsible offeror whose proposal is most advantageous to the District with price and other factors considered. The bid will hold pricing for one (1) year beginning May 20, 2024, through May 19, 2025. The bid includes the option of three (3), one (1) year term extensions at the set price on the purchase of additional units. The total amount of this purchase is $1,455,760.00 for the initial purchase and will be reimbursed with Fund 175 COVID Federal Grants. All products purchased after September 1, 2024, will not use Fund 175 COVID Federal Grants. ?All products purchased after September 1, 2024, will not use Fund 175 COVID Federal Grants.
Complete bid documentation contact elizabeth.knowline@ops.org
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.5. Approval to Award Bid No. 24-046 to Adorama, Inc, B & H Foto and Electronic Corp (Doing Business As B & H Photo Video), Focus Camera, and Kearney Media for Journalism Equipment ($469,433.61)
Rationale:
FUND: 1 & 175 General Fund and COVID Federal Grants
PROGRAM: 1100 Regular Instruction DEPT: 7193010 Secondary Education Admin PROJECT: 499232 ESSERS III - Instructional Materials SUPPLIER: 31862 Adorama, Inc $ 33,470.10 SUPPLIER: 77324 Focus Camera $ 31,248.90 SUPPLIER: 2323 B & H Photo Video $404,165.16 SUPPLIER: 77230 Kearney Media $ 549.45 POLICIES: 7000, VII.A. AMOUNT: $469,433.61 Administration recommends award of Bid 24-046 for Journalism Equipment to the following suppliers: Adorama, Inc., B & H Foto and Electronic Corp (Doing Business As B & H Photo Video), Focus Camera, and Kearney Media who are the responsible offerors whose proposals are most advantageous to the District with price and other factors considered. Bid No 24-046 was issued for the purchase of Journalism Equipment for all nine (9) District High Schools to support Journalism education. The District received five (5) bid responses. All awards are being made to the lowest compliant bidder for each line item. The following individual products were deemed non-compliant. Adorama, Inc. submitted items other than what was specified in the bid requirements for lines J-7, J-8, J-18, and J-25 and VSA, Inc. did not meet size requirements for line J-17. This purchase aligns with Pillar 1 - Academic Recovery and Acceleration Support and will be reimbursed with Fund 175, COVID Federal Grants. This is a one-time purchase. The total amounts awarded are: Adorama, Inc. $33,470.10, B & H Photo Video $404,165.16, Focus Camera $31,248.90, and Kearney Media $549.45.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.6. Approval to Award Proposal No. P002-24 to Skill Struck and Code HS for K-12 Computer Science and Technology Curriculum and Resources and the Attached Contracts and Data Protection Agreements to be used in the District’s K-12 Computer Science and Technology for the 2024-2025 through 2030-2031 School Years ($3,439,450.00)
Rationale:
FUND: 1 & 175, General Fund reimbursed by Covid Federal Grants
PROGRAM: 1100, Regular Instruction DEPT: 7192010, Elementary Education; 7193010, Secondary Education PROJECT: 499253 - ESSERS III SUPPLIER: Skill Struck SUPPLIER: Code HS POLICIES: 7000, III. K, 7000, VII.A., 6121 AMOUNT: $3,058,950 FUND: 1, General Fund PROGRAM: 1100, Regular Instruction DEPT: 7192010, Elementary Education; 7193010, Secondary Education SUPPLIER: Skill Struck SUPPLIER: Code HS POLICIES: 7000, III. K, 7000, VII.A., 6121 AMOUNT: $380,500 Administration recommends approval of the attached Agreements with two publishers to purchase materials and resources to support its K-12 Computer Science and Technology curriculum. The District systemically reviewed its K-12 Computer Science & Technology materials and resources. As part of that process, the District issued Request for Proposal P002-24 for K-12 Computer Science and Technology. Following the initial review of submissions, multiple resources and related materials were selected for field testing. Utilizing guidance and rubrics, high-quality instructional materials were selected based on analysis of the Computer Science and Technology Act and K-12 Computer Science Standards, teacher reviews, field-testing, bias reviews, cost range, usability, student experience, assessment, rigor, and community reviews in keeping with the provisions of Policy 6121. Each of the attached recommendations was the responsible offeror whose proposal is most advantageous to the District with price and other factors considered. The total awarded price is $3,439,450.00. This project is funded under Pillar I of the approved ESSERS plan. General Fund 1 will be used and reimbursed from Fund 175 COVID Federal Grants. With the expectation that ESSERS funding concludes on September 30, 2024, all professional learning after that date will be supported through general funds.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.7. Approval to Award Proposal No. P018-23 to Vista Higher Learning for Secondary English Learner Textbooks and Resources and the Attached Contract and Data Protection Agreement to be used in the District’s 6-12 English Learner Textbooks and Resource Purchase for the 2024-2025 through 2030-2031 School Years ($1,348,950.00)
Rationale:
FUND: 1 & 175 General Fund reimbursed by Covid Federal Grants
PROGRAM: 1100 Regular Instruction DEPT: 7193010 Secondary Education Administration PROJECT: 499253 - ESSERS III SUPPLIER: Vista Higher Learning POLICIES: 7000, III. K, 7000, VII.A., 6121 AMOUNT: $1,228,950.20 FUND: 176, Misc. Grants PROGRAM: 1170, English Language Learners DEPT: 7198170, English As a Second Language SUPPLIER: Vista Higher Learning POLICIES: 7000, III. K, 7000, VII.A., 6121 AMOUNT: $120,000.00 Administration recommends approval of the attached agreement with Vista Higher Learning to purchase textbooks and resources which will support its 6-12 English Learner curriculum. In addition to the individual agreement, a summary document is attached specifying the publisher selected, products, and the total cost of the agreement. The District undertook systematic review of its 6-12 English Learner textbooks and resources. As part of that process, the District issued Request for Proposal P018-23 for grades 6-12. Following initial review of submissions, multiple textbooks and related materials were selected for field testing. Utilizing guidance and rubrics, the high-quality instructional materials were selected based on analysis of Nebraska K-12 English Language Proficiency standards and English Language Arts standards aligned skills, teacher reviews, field testing, bias reviews, cost range, usability, student experience, assessment, rigor and community reviews in keeping with the provisions of Policy 6121. The attached recommendation was the responsible offeror whose proposal is most advantageous to the District with price and other factors considered. The total awarded price is $1,415,610.21. This project is funded under Pillar I of the approved ESSERS plan. General Fund 1 will be used and reimbursed from Fund 175 COVID Federal Grants. With the expectation that ESSERS funding concludes on September 30, 2024, all professional learning after that date will be supported through Title III Grant funds.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.8. Approval to Award Proposal No. P019-23 to Houghton Mifflin Harcourt (HMH) and Savvas, for Secondary Reading Intervention Textbooks and Resources and the Attached Contracts and Data Protection Agreements to be used in the District’s Secondary Reading Intervention Textbook Purchase for the 2024-2025 through 2030-2031 School Years ($5,073,964.76)
Rationale:
FUND: 1 & 175, General Fund reimbursed by Covid Federal Grants
PROGRAM: 1100, Regular Instruction DEPT: 7193010, Secondary Education Administration PROJECT: 499253 - ESSERS III SUPPLIER: Savvas SUPPLIER: Houghton Mifflin Harcourt POLICIES: 7000, III. K, 7000, VII.A., 6121 AMOUNT: $4,284,794.88 FUND: 1, General Fund PROGRAM: 1100, Regular Instruction DEPT: 7193010, Secondary Education Administration SUPPLIER: Savvas SUPPLIER: Houghton Mifflin Harcourt POLICIES: 7000, III. K, 7000, VII.A., 6121 AMOUNT: $789,169.88 Administration recommends approval of the attached Agreements with various publishers to purchase materials and resources which will support its Secondary Reading Intervention curriculum. In addition to the individual agreements, a summary document is attached specifying the individual publishers selected and the total cost of each agreement. The District undertook systematic review of its Secondary Reading Intervention materials and resources. As part of that process, the District issued Request for Proposal P019-23 for reading intervention in grades 6-12. Following the initial review of submissions, multiple resources and related materials were selected for field-testing. Utilizing guidance and rubrics, high quality instructional materials were selected based on analysis of secondary reading intervention best practices and Nebraska English Language Arts Standards, teacher reviews, field-testing, bias reviews, cost range, usability, student experience, assessment, rigor and community reviews in keeping with the provisions of Policy 6121. Each of the attached recommendations was the responsible offeror whose proposal is most advantageous to the District with price and other factors considered. The total awarded price is $5,073.946.76. This project is funded under Pillar I of the approved ESSERS plan. General Fund 1 will be used and reimbursed from Fund 175 COVID Federal Grants. With the expectation that ESSERS funding concludes on September 30, 2024, all professional learning after that date will be supported through general funds.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.9. Approval to Award Proposal No. P020-23 to Savvas, Houghton Mifflin Harcourt, Bedford, Freeman & Worth, and Perfection Learning for English Language Arts Textbooks and Resources and the Attached Contracts and Data Protection Agreements to be used in the District’s 6-12 English Language Arts Textbook Purchase for the 2024-2025 through 2030-2031 School Years ($8,032,145.73)
Rationale:
FUND: 1 & 175, General Fund reimbursed by COVID Federal Grants
PROGRAM: 1100, Regular Instruction DEPT: 7193010, Secondary Education Administration PROJECT: 499253, ESSER III SUPPLIER: Savvas SUPPLIER: Houghton Mifflin Harcourt SUPPLIER: Bedford, Freeman & Worth SUPPLIER: Perfection Learning POLICIES: 7000, III.K., 7000, VII.A., 6121 AMOUNT: $7,298,085.73 FUND: 1, General Fund PROGRAM: 1100, Regular Instruction DEPT: 7193010, Secondary Education Administration SUPPLIER: Savvas SUPPLIER: Houghton Mifflin Harcourt SUPPLIER: Bedford, Freeman & Worth SUPPLIER: Perfection Learning POLICIES: 7000, III. K, 7000, VII.A., 6121 AMOUNT: $ 734,060.00 Administration recommends approval of the attached agreements with various publishers to purchase textbooks which will support its 6-12 English Language Arts curriculum. In addition to the individual agreements, a summary is attached specifying the individual publishers selected and the total cost of each agreement. The District undertook a systematic review of its 6-12 English Language Arts textbooks. As part of that process, the District issued Request for Proposal P020-23 for grades 6-12. Following the initial review of submissions, multiple textbooks and related materials were selected for field testing. Utilizing guidance and rubrics, high quality instructional materials were selected based on analysis of English Language Arts content and standards-aligned skills, teacher reviews, field-testing, bias reviews, cost range, usability, student experience, assessment, rigor and community reviews in keeping with the provisions of Policy 6121. Each of the attached recommendations was the responsible offeror whose proposal is most advantageous to the District with price and other factors considered. The total awarded price is $8,032,145.73. This project is funded under Pillar I of the approved ESSERS plan. General Fund 1 will be used and reimbursed from Fund 175 COVID Federal Grants. With the expectation that ESSERS funding concludes on September 30, 2024, all professional learning after that date will be supported through general funds.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.10. Approval of Change Order No. 001 for Bid 24-035 OPS Niagara N4 Supervisor Software Integration at Multiple Buildings – (Neutral $0.00) Total Remains: $106,852.00
Rationale:
FUND: 1 & 175 General Fund reimbursed by COVID Federal Grants
PROGRAM: 2620 Maintenance School/District Buildings DEPT. ID: 7166600 Schoolhouse Planning SUPPLIER: Hausmann Construction, Inc. POLICIES: 7000, III.K., 7000, VII.A, 7000, VII.D AMOUNT: $0.00 Pursuant to Policies 7000, IV. G., Administration and Jacobs, recommend that the following change order agreement be submitted for approval: Project: Bid 24-035 OPS Niagara N4 Supervisor Software Integration at Multiple Buildings Architect/Engineer: N/A Contractor: Woodman Controls Company This work is funded utilizing Esser III Funds under Pillar 3 - Infrastructure for the Future and will be reimbursed using Fund 175 Covid Federal Grants.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.11. Approval of Change Order No. 001 for South High School Capital Improvements & Renovation Project – 2018 Bond Program - Add $7,788.00 Revised Total: $10,898,733.00
Rationale:
FUND: 42 - 2018 Bond Program Proceeds Fund
PROGRAM: 2591 - Buildings & Grounds DEPT: 3330020 - South High School PROJECT: 321525 - South High School Capital Improvements & Renovation Project SUPPLIER: The Weitz Company, LLC POLICY: 7000, IV.G. AMOUNT: $7,788.00 Pursuant to Policies 7000, IV. G., Administration and Jacobs with the concurrence of the project architect/engineer, BCDM Architects, recommend that the following change order agreement be submitted for approval: Project: South High School Capital Improvements & Renovation Project Architect/Engineer: BCDM Architects Contractor: The Weitz Company, LLC Fund: 42 2018 Bond Program
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.12. Approval of Claims Report A - District Expenditure
Rationale:
The Board of Education is required by State Statute 79-584 to approve all expenditures of District funds. Expenditures are presented to the Board for approval in the form of a Claims Report. Claims Report A is a listing of all District expenditures and are organized and presented to the Board by which fund the expenditure is being made from (e.g. General Fund, Bond Fund, etc.).
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.13. Approval of Claims Report B - Expenditures from Various Student Activity Funds for which the Board Serves as Custodian
Rationale:
The Board of Education is required by State Statute 79-584 to approve all expenditures of funds for which the District serves as custodian. Expenditures are presented to the Board for approval in the form of a Claims Report. Claims Report B is a listing of expenditures from the various Student Activity Funds for which the Board serves as custodian.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.14. Approval of Claims Report C - Expenditures on behalf of Board Members or their Related
Rationale:
Board Members are prohibited by Nebraska law from voting on items which may personally benefit them. Expenditures which may personally benefit individual Board Members are presented to the Board for approval in the form of a separate Claims Report in order to permit those Board Members to abstain from voting on items which may personally benefit them. The Board of Education is required by State Statute 79-584 to approve all expenditures of District funds. Claims Report C is a listing of expenditures that may relate to individual Board Members or Organizations that employ them.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.15. Approval of Claims Report D - Payroll Expenditures
Rationale:
The Board of Education is required by State Statute 79-584 to approve all expenditures of District funds. Payroll expenditures are presented to the Board for ratification in the form of a Claims Report. Claims Report D is a summary of payrolls processed and is presented by payroll and pay date.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.16. Approval of Claims Report E - Payroll Estimated Expenditures
Rationale:
The Board of Education is required by State Statute 79-584 to approve all expenditures of District funds. Payroll expenditures are presented to the Board for ratification in the form of a Claims Report. Claims Report E is an estimation of payrolls to be processed prior to the next Board meeting and is presented by payroll and pay date. Board authorization is requested for amounts not to exceed the totals in the Claims Report.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.17. Approval of Educational Service Unit No. 19 Claims - Expenditures to be Paid from Education Service Unit's Funds
Rationale:
The Board of Education serves as the Board of Educational Service Unit 19. The Board of Educational Service Unit 19 is required to approve all expenditures of District funds as well as funds for which the District serves as custodian. Expenditures are presented to the Board for approval in the form of a Claims Report. Educational Service Unit No. 19 Claims Report is a listing of all expenditures to be paid from the Education Service Unit's funds.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.18. Approval of Omaha School Employees Retirement System Claims - Expenditures to be paid from the OSERS's Funds
Rationale:
In keeping with the provisions of Nebraska Revised Statute section 79-981, the Board of Education is responsible for the transaction of OSERS’ business, including approval of expenditures of OSERS’ funds. The Administration recommends approval of the attached claims to be paid from OSERS’ funds.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.19. Committee on Claims Audit Approval (5/20/2024)
Rationale:
State Statue 79-584 requires the Secretary to the Board of Education to audit all accounts of the Class V school district and to submit that audit to the Board of Education Audit Committee for review and approval. The objective of the audit is to obtain and review sufficient claim documentation to determine the risk of material misstatement. The audit methodology is set forth on the Claims Audit Report.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.20. Approval of Contract for Bid No. 24-038 to McKinnis Roofing and Sheet Metal, LLC for Kennedy Elementary Roof Replacement, Sections B, B1, C, D, F, G, H, I, and J in the Summer of 2024 ($276,600.00)
Rationale:
FUND: 1 & 175 General Fund and COVID Federal Grants
PROGRAM: 2620 Maintenance School/District Buildings DEPT. ID: 0660020 Kennedy Elementary Facility PROJECT: 499296 Kennedy Elementary Roofing Project SUPPLIER: McKinnis Roofing and Sheet Metal, LLC POLICY: 7000, IV. C. AMOUNT: $276,600.00 Administration recommends approval of the contract for Bid No. 24-038 with McKinnis Roofing & Sheet Metal, LLC for Kennedy Elementary Roof Replacement, Sections B, B1, C, D, F, G, H, I, and J in the Summer of 2024. Bid 24-038 was awarded to McKinnis Roofing and Sheet Metal, LLC by the Board of Education on April 15, 2024. The project will include the removal and replacement of the existing roofing in these sections that have exceeded their useful life and no longer provide adequate energy efficiencies. The total cost of this contract is $276,600.00 and is being funded by the general fund, which will be reimbursed by COVID Federal Grants.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.21. Approval of Contract for Bid No. 24-039 to 10 Men Roofing, LLC for Conestoga Elementary Roof Replacement, Sections B, C, F, G, in the Summer of 2024 ($369,000.00)
Rationale:
FUND: 1 & 175 General Fund and COVID Federal Grants
PROGRAM: Maintenance School/District Buildings DEPT. ID.: 1360020 Conestoga Elementary Facility PROJECT: 499297 Conestoga Elementary Roofing Project SUPPLIER: 10 Men Roofing, LLC POLICY: 7000, IV. C AMOUNT: $369,000.00 Administration recommends approval of contract for Bid No. 24-039 with 10 Men Roofing, LLC for Conestoga Elementary Roof Replacement, Sections B, C, F, G, in the Summer of 2024. Bid 24-039 was awarded to 10 Men Roofing, LLC at the April 15, 2024, Board of Education Meeting. The project will include removing and replacing the existing roofing in those sections that have exceeded their useful life and no longer provide adequate energy efficiencies. The total cost of this contract is $369,000.00 and is being funded by the General Fund, which will be reimbursed by COVID Federal Grants.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.22. Approval of Contract for Bid No. 24-041 to 10 Men Roofing, LLC for OPS Service Center Roof Replacement, Sections A, B, C, in the Summer of 2024 ($310,943.00)
Rationale:
FUND: 1 & 175 General Fund and COVID Federal Grants
PROGRAM: 2620 Maintenance School/District Buildings DEPT. ID.: 7220020 Service Center Facility PROJECT: 499295 Service Center Roofing Project SUPPLIER: 10 Men Roofing, LLC POLICY: 7000, IV. C. AMOUNT: 310,943.00 Administration recommends approval of contract for Bid No. 24-041 with 10 Men Roofing, LLC for OPS Service Center Roof Replacement, Sections A, B, C, in the Summer of 2024. Bid 24-041 was awarded to 10 Men Roofing, LLC at the April 15, 2024, Board of Education Meeting. The project will include removing and replacing the existing roofing in those sections that have exceeded their useful life and no longer provide adequate energy efficiency. The total cost of this contract is $310,943.00 and is being funded by the general fund, which will be reimbursed by COVID Federal Grants.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.23. Approval for Declaration to Surplus Thirty-Six (36) Relocatable Classroom Buildings
Rationale:
Pursuant to Policy 3090, Administration recommends that thirty-six (36) relocatable classroom buildings listed below be declared surplus and that staff be authorized to determine the appropriate disposition of these buildings. The relocatable classrooms are no longer needed to accommodate the student population due to new classroom additions and the construction of schools under the 2014/2018 bond construction program and current student assignment plan.
Staff further recommends that the District’s Chief Operations Officer, or their designee, be authorized to sign on behalf of the District all necessary documents to remove or retire the buildings.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.24. Approval to Enter into Contract with Pairaphrase, LLC, for Special Education Document Translation Services, for the 2024-2025 School Year with Possible Extension for 2025-2026 School Year and 2026-2027 School Year ($52,300.00)
Rationale:
FUND: 1 General Fund
PROGRAM: 1230 Placement DEPT: 7194010 Curriculum Instruction Support Special Education SUPPLIER: Pairaphrase LLC. POLICY: 6600 D. AMOUNT: $52,300.00 Administration recommends approval of the attached contract with Pairphrase LLC to provide special education document translation services for the 2024-2025 school year. The Board of Education approved awarding RFP No. P005-24 to Pairaphrase LLC on March 4, 2024. The contractor will provide remote access to the secure Software System that will enable accurate translation services of special education documents into multiple languages. The agreement includes training and technical support, and ensures we meet the federal and state requirements that the parent/guardian have access to and understand the content of all documents. The service contract is for one year with the option to extend for two additional consecutive one-year terms at $49,800.00 plus consumer price index increase (capped at 5%) if exercised on August 1 of each subsequent year. The total cost of this agreement is $52,300.00.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.25. Approval to Extend the Contract with Collaborative Student Transportation of Minnesota LLC. for Student Transportation Services for One (1) Year (Budgeted $1,396,750.00)
Rationale:
FUND: 1 General Fund
PROGRAM: 2750, Regular Education; 2760 Special Education; 3102 Early Childhood Special Education DEPT: 7162800 Student Transportation SUPPLIER: Collaborative Student Transportation of Minnesota LLC. POLICY: 7000, Article VII, Section III A AMOUNT: $1,396,750.00 (Budgeted) Administration recommends approval to extend the contract with Collaborative Student Transportation of Minnesota, LLC. for one (1) year. This contract was approved by the Board of Education on October 26, 2023, with the option to extend the term of the Agreement for two (2) terms of one (1) year each. If approved, this term would be the first extension and would take effect on August 1, 2024, and end on July 31, 2025. Collaborative Student Transportation of Minnesota, LLC. provides additional student transportation services each day to Omaha Public School's students, who are designated by the District for services on a needs-only basis. These services may support Title I Pre-Kindergarten Students and Homeless Students. The actual cost of this extension will be based on actual usage during the school year but is estimated at $1,396,750.00 based on current usage.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.26. Approval to Extend the Contract with North End Teleservices, LLC for Call Center Support for One (1) year (Budgeted $1,500,000.00)
Rationale:
FUND: 1 General Fund
PROGRAM: 2750, Regular Education; 2760 Special Education; 3102 Early Childhood Special Education DEPT: 7162800 Student Transportation SUPPLIER: North End Teleservices, LLC POLICY: 7000, VII, III.A AMOUNT: $1,500,000.00 (Budgeted) Administration recommends approval to extend the agreement with North End Teleservices, LLC for one (1) year. This contract was approved by the Board of Education on August 7, 2023, with the option to extend for two (2) terms of one (1) year each. If approved, this term would be the first extension and would take effect on August 1, 2024, and end on July 31, 2025. This service agreement provides phone representatives who staff the student transportation call center for 12 hours daily for the 2024-2025 school term. Phone representatives assist parents, students, and staff with questions and concerns related to transportation services. North End Teleservices, LLC will solely provide staff for the call center. The total cost for the 2024-2025 school year is approximately $1,500,000.00.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.27. Approval of Financial Results from February 18, 2024 through March 3, 2024 District Surplus On-line Auction Provided by Auction Mill L.L.C. ($54,267.60)
Rationale:
FUND: 1 General Fund
DEPT.: 7062000 Default Dept. for Non-Expend ACCOUNT: 45401 Sell of supplies/junk auction PROGRAM: 2500 Default Non-Expenditure Program CLASS: 000 Default No Class POLICIES: 3090 Sales and Disposal of Books, Equipment, and Supplies AMOUNT: $54,267.60 Pursuant to Policy 3090, Administration is reporting the financial results from the District surplus auction held online from February 18, 2024, through March 4, 2024. The surplus auction was approved at the Board of Education meeting on Thursday, February 8, 2024, providing $33,608.80 in funds to the District, as shown below. Miscellaneous Sales $36,447.00 Vehicle Sales $27,900.00 Gross Amount $64,347.00 Less Commission of 20% From Miscellaneous Sales $ 7,289.40 Less Commission of 10% From Vehicle Sales $ 2,790.00 Total of subtracted cost: $10,079.40 Net to the district $54,267.60 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.28. Approval of First and Second Option Pricing for Paper Education America, Inc.
Rationale:
FUND: 1 General Fund
PROGRAM: 1100 Regular Instruction DEPT: 7072002 School Improvement POLICIES: 7000, III. K., 7000, VII. A AMOUNT: $347, 535.00 annually + $30.00/hour usage fee per hour consumed Omaha Public Schools awarded Bid No. P010-23 to Paper Education America, Inc. in January of 2023 as part of ESSERs-funded, COVID-related recovery efforts associated with Academic Support & Tutoring. Paper is a technology-based platform offering online, on-demand tutoring across core subject areas in multiple languages with reporting dashboards for implementation monitoring. Administration recommends exercising of first and second pricing options, extending access to online tutoring for 3rd-12th grade OPS students through August 31, 2025. This resource aligns to the OPS Strategic Plan of Action Priority 1 emphasis on literacy and math growth and to the District’s plan for academic recovery and acceleration. The total price is comprised of both platform and usage fee. The Platform Fee is $9.00/license x 38,615 students = $347,535.00 annually + an estimated 12,000 hours of usage at $360,000. The total estimated amount is $707,535 based on current use.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.29. Approval of Head Start Fiscal Year 2024 Cost of Living Adjustment (COLA)
Rationale:
FUND: 156 Head Start/Early Head Start
PROGRAM: 3201 Early Childhood DEPT: 0660085 Head Start Grant AMOUNT: $208,737.00 POLICIES: 3570, Section 642 Head Start Act Per Section 642 of the Head Start Act, the Board of Education serves as the Governing Body for Head Start. The Head Start Governing Body/Board of Education is required to review and approve all applications for funding, in accordance with Board Policy 3570. Staff recommends approval of the Head Start Fiscal Year 2024 Cost of Living Adjustment (COLA) grant application to support payroll expenses. Omaha Public Schools Head Start and its delegate will apply the 2.35% cost of living adjustment totaling $208,737 to payroll and benefits to support the contractual salary increases and fringe benefits per annual contract negotiations.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.30. Approval of the Head Start Quality Improvement Plan
Rationale:
The Head Start program received a program performance summary report on April 23, 2024. In response to the report, the Administration has prepared the attached Quality Improvement Plan that it proposed to implement during the coming school year. In keeping with the provisions of Section 642 of the Head Start Act, the Board of Education serves as the Governing Body for Head Start. The Head Start Governing Body is required to review and approve specific processes of the program including implementation of corrective action plans. As such, Administration recommends approval of the Quality Improvement Plan.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.31. Approval of Head Start Self-Assessment Program Improvement Plan for 2023-2024
Rationale:
Per Section 642 of the Head Start Act, the Board of Education serves as the Governing Body for Head Start. The Head Start Governing Body is required to review and approve specific processes of the program, including the annual self-assessment. The Head Start program conducted the 2023-2024 Self-Assessment during the month of April. Head Start staff collected program data in the areas of education, health/safety, and family engagement. Head Start staff used the information to create the improvement plan to be implemented during the upcoming program year.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.32. Approval of a Permanent Sidewalk & Traffic Signal Easement with the City of Omaha, Nebraska, at Jackson Elementary School
Rationale:
Pursuant to Policy 7000, IX, A, 1., Administration recommends approval of a permanent sidewalk and traffic signal easement at 620 S 31st Street, Omaha, NE. 68105 (Jackson Elementary). The parcel includes approximately one hundred and nineteen (119) square feet at the southeast corner of the property to maintain the traffic signal at the intersection of 31st Street and St. Mary’s Avenue. The City of Omaha will provide compensation of $1,792.00 for this permanent easement.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.33. Approval of Proposed Staffing Adjustments
Rationale:
Policy 4001 and 4035 require that the election of employees shall be by action of the Board of Education upon recommendation of the Superintendent or designee. Additionally, Policy 4008 requires that the Chief Human Resources Officer process all retirements, resignations, cancellations, contract amendments and terminations of employment making a recommendation for appropriate action to the Superintendent and Board of Education. Therefore, the District recommends the approval of the attached Staffing Adjustments.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.34. Approval to Purchase Additional Textbooks from Cengage Learning to Support Personal Finance at Buena Vista and Westview High Schools ($58,905.00)
Rationale:
FUND: 1, General Fund
PROGRAM: 1100, Regular Instruction DEPT: 7193010, Secondary Education Administration POLICIES: 7000 V.A., 6121 VENDOR: Cengage Learning, Inc. AMOUNT: $58,905.00 Administration recommends approval to purchase additional textbooks from Cengage Learning to support Personal Finance at Buena Vista and Westview High Schools. Materials match previously adopted instructional materials for Personal Finance to support senior-level students at both schools. In keeping with the bid exceptions contained within Policy 7000, V.A., no bid was required for this purchase. This item is being presented to the Board for approval in keeping with the provisions of Policy 6121 which requires approval by the Board of curricular materials. The total cost of this purchase is $58.905.00.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.35. Approval to Purchase HMH Into Reading Structured Literacy Books as a Supplemental Resource for K-2 English Language Arts Curriculum ($58,750.31)
Rationale:
Fund: 1, General Fund
PROGRAM: 1100 Regular Instruction DEPT: 7192010 Elementary Education Administration SUPPLIER: Houghton Mifflin Harcourt POLICIES: 7000, V.A., 6121 AMOUNT: $58,750.31 Administration recommends approval of the attached agreement with Houghton Mifflin Harcourt (HMH) for the purchase of a new supplemental pathway structure for foundational skills titled HMH Into Reading Structured Literacy. This supplemental resource will support the current K-2 English Language Arts curriculum, HMH Into Reading which was approved by the Board of Education on March 2, 2020. In keeping with the provisions of Policy 7000, V.A., no bid was required for this purchase because it falls under the exception to bidding procedures as academic prerogative. This item is being presented to the Board for approval in keeping with the provisions of Policy 6121,which requires approval by the Board of curricular materials. The cost to the District for this supplemental resource is $58,750.31.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.36. Approval to Purchase National Geographic’s Lift and ThinkCERCA Writing Across the Curriculum as Supplemental Resources for 6-12 Secondary English Learner Resources for 2024-2025 through 2030-2031 ($1,313,597.38)
Rationale:
FUND: 176, Miscellaneous Federal Grants
PROGRAM: 1170, English Language Learners DEPT: 7198170, English As a Second Language GRANTS: 464924, Title III Limited English Proficiency 471024, Title III Emergency Immigrant Education VENDORS: ThinkCERCA ($512,660.00) Cengage Learning ($800,937.38) POLICIES: 7000 V.A., 6121 Total Amount: $1,313,597.38 Administration has been in the process of undertaking a systemic review of the District’s 6-12 Secondary English Learner textbooks. At the high school level, the Administration recommends National Geographic’s Lift and ThinkCERCA Writing Across the Curriculum as supplemental resources to provide additional academic literacy experiences for ESL students. The EL Leadership team reviewed these resources in alignment with our Learning Framework and the EL Academic Model to ensure alignment with core instructional shifts, English Language Proficiency Standards, and English Language Arts Standards. Other resources that were submitted did not meet specifications. The purchase includes online and hard copy resources for seven (7) years. On April 3, 2024, Administration presented their findings and recommendations to the Curriculum Committee. In keeping with the provisions of Policy 7000, V.A., no bid was required for this purchase because it falls under the exception to bidding procedures as academic prerogative. This item is being presented to the Board for approval in keeping with the provisions of Policy 6121,which requires approval by the Board of curricular materials.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.37. Approval to Purchase NoRedInk, Newsela, and Commonlit for Online Supplemental Resources and the Attached Contracts and Data Protection Agreements to be used in the District’s 6-12 English Language Arts Courses for the 2024-2025 through 2030-2031 School Years ($3,042,680.00)
Rationale:
FUND: 1, General Fund
PROGRAM: 1100, Regular Instruction DEPT: 7193010, Secondary Education Administration SUPPLIER: NoRedInk SUPPLIER: Newsela SUPPLIER: CommonLit POLICIES: 7000, V.A.; 6121 AMOUNT: $3,042,680.00 Administration recommends approval to purchase NoRedInk, Newsela, and Commonlit as online supplemental resources for use in secondary English Language Arts courses. These resources were included in the recommendations shared with the Board of Education on Monday, April 15, 2024, as part of the Secondary English Language Arts Adoption. These items were received as part of the submission for RFP 020-23 and were field tested alongside the textbooks recommended for adoption and presented to the Curriculum Committee on April 3, 2024. This item is being presented to the Board for approval in keeping with the provisions of Policy 6121,which requires approval by the Board of curricular materials. The agreed upon Data Protection Agreements and Terms and Conditions Agreements are attached. The total price for the purchase is $3,042,680.00.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.38. Approval to Purchase Thirteen Thousand Two Hundred (13,200) iPads, Four Thousand One Hundred Fifty (4,150) MacBook Air Laptops, and Necessary Accessories for High School Students and Staff for the 2024-2025 School Year ($9,808,920.00)
Rationale:
FUND: 1 & 175 General Fund reimbursed by COVID Federal Grants
PROGRAM: 1100 Regular Instruction DEPT: 7062560 Districtwide Technology PROJECT: 499254 ESSERS III - Technology Tools SUPPLIER: Apple Inc. POLICIES: 7000, III. K.,7000, V. G. AMOUNT:$9,808,920.00 Administration recommends approval to purchase eight thousand two hundred (8,200) iPads for high school student device refresh, five thousand (5,000) iPads for staff iPad refresh, and four thousand one hundred fifty (4,150) MacBook Air M1 model laptops for staff laptop refresh for a total of $9,808,920.00. This purchase will allow 10th grade students, 11th grade students and certificated staff at all grade levels to receive updated devices. These devices are necessary due to the current age of their iPads and laptop devices. This purchase includes the devices themselves as well as various necessary accessories. $1,395,500.00 of this purchase will be used for Logitech Rugged Combo 3 cases for all 9th through 12th grade students. This case incorporates a keyboard and a kickstand, allowing high school students to type on their iPads more efficiently. These cases are required to be installed at the time of deployment assistance services for full warranty coverage. $358,845.00 of the purchase will be for deployment assistance purchased through Apple professional services. $8,054,575.00 of this purchase covers the cost of the iPads and MacBook’s for a total cost of $9,808,920.00. Apple Inc. is the responsible offeror whose proposal is most advantageous to the District with price and other factors considered. Apple Inc. is the sole source provider for iPad Air laptops, so this item was not bid as it is an exception to Policy 7000 (V.G.). This purchase is in alignment with Piller 1 - Academic Recovery & Acceleration Support and this purchase from the general funds will be reimbursed with Fund 175, COVID Federal Grants. The four-year Apple Care Warranty is being purchased separately due to ESSERS definition.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.39. Approval to Purchase Four-Year Apple Care Warranty for Thirteen-Thousand Two Hundred (13,200) iPads ($1,042,800.00)
Rationale:
FUND: 7313 Security Deposit IMS
PROGRAM: 1100 Regular Instruction DEPT: 7062800 Risk/Safety Management SUPPLIER: Apple Inc. POLICIES: 7000, III. K.,7000, V. G. AMOUNT: $1,042,800.00 Administration recommends the purchase of a four-year Apple Care warranty for the thirteen-thousand two hundred (13,200) iPads for students and staff. The cost is $79.00 per device. Due to requirements regarding the use of ESSER funds, this item has been purchased separately from the rest of the ESSERS-reimbursable purchases. The purchase of thirteen-thousand two hundred (13,200) four-year Apple Care warranties amounts to $1,042,800.00. In keeping with the provision of policy 7000, V.G., no bid was required for these purchases because Apple, Inc. is the sole source provider for Apple products. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.40. Approval to Purchase a Two-Year Extension of Digital Instructional Materials from Cengage Learning to Support Accounting at the High School Level for 2024-25 through 2025-26, ($68,500)
Rationale:
FUND:1, General Fund
PROGRAM:2211, Career and Tech Ed Support DEPT:7196010, Career & Technical Education POLICIES: 7000 V.A., 6121 VENDOR:Cengage Learning, Inc. AMOUNT: $68,500.00 Administration recommends approval to purchase an extension of digital instructional materials from Cengage Learning to support Accounting at the high school level for implementation in the 2024-2025 through 2025-2026 school years. In keeping with the bid exceptions of Academic Prerogative contained within Policy 7000, V.A., no bid was required for this purchase. This item is being presented to the Board for approval in keeping with the provisions of Policy 6121 which requires approval by the Board of curricular materials. The total cost of this purchase is $68,500.00.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.41. Approval to Purchase Fifty (50) 14-inch MacBook Pro Laptops for Building Technology Support Staff ($99,400.00)
Rationale:
FUND: 1 & 175 General Fund reimbursed by COVID Federal Grants
PROGRAM: 1100 Regular Instruction DEPT: 7062560 Districtwide Technology PROJECT: 499254 Technology Tools SUPPLIER: Apple Inc. POLICIES: 7000, III. K.,7000, V. G. AMOUNT: $99,400.00 Administration recommends approval to purchase fifty (50) MacBook Pro Laptops for use by Building Technical Support (BTS) Staff. This purchase will allow User Support personnel to better assist students and teachers at all levels with technology needs and troubleshooting. These laptops will replace current MacBooks that were purchased in 2017. Apple, Inc. is the sole source provider for MacBook Air Laptops, so this item was not bid as it is an exception to Policy 7000 (V.G.) and ESSERS regulations. This purchase is in alignment with Pillar I - Academic Recovery & Acceleration Support and this purchase from general funds will be reimbursed with Fund 175, COVID Federal Grants. The purchase of these devices totals $99,400.00. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I.42. Approval of Second Extension of Contract with Risk Administration Services, Inc. (RAS) for Two (2) Years to Manage All Workers Compensation Claims ($839,105.00)
Rationale:
FUND: 4036 Workers Compensation Fund
PROGRAM: 2510 Business Support Services DEPT. ID: 7062100 Accounting and Finance SUPPLIER: Risk Administration Services, Inc. AMOUNT: $839,105.00 Administration recommends approval of the attached contract extension with Risk Administration Services, INC. (RAS) for workers’ compensation third-party administration (TPA) services. The Board approved the initial agreement with RAS in April 2017 and extended this contract for three (3) years in April 2021. The proposed extension is for two (2) years running from May 2024 through April 2026. RAS has agreed to an annual flat fee of $412,337.00 for the first year and $426,768.00 for the second year to manage the intake, claims processing, claim management, and reporting for all worker's compensation claims incurred by the District. The total cost of this two (2) year extension is $839,105.00.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
J. Discussion and/or Action Items
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
J.1. Information Item(s)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
J.1.a. Accountability Committee Update
Rationale:
The Chair of the Accountability Committee will provide an update.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
J.1.b. Legislative Committee Update
Rationale:
The Chair of the Legislative Committee will provide an update.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
J.1.c. Policy Committee Update
Rationale:
The Chair of the Policy Committee will provide an update.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
J.2. Action Item(s)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
J.2.a. Approval of the Proposed Amendment to the Plan for Expenditure of $194,556,061 Allocated to the District by the Nebraska Department of Education (NDE) from the Elementary and Secondary School Emergency Relief (ESSER) ESSER III Fund which was Originally Approved by the Board of Education on September 9, 2021.
Rationale:
On September 9, 2021, the Board of Education approved the Plan for Expenditure of $194,556,061 allocated to the District by the Nebraska Department of Education (NDE) from the Elementary and Secondary School Emergency Relief (ESSER) III Fund. The plan was submitted to and approved by NDE. Additionally, the Board of Education approved amendments to the plan for ESSER III Funds on March 7, 2022, June 6, 2022, and May 1, 2023. Since that time and following additional input, Administration is recommending that the District’s plan be amended as is more fully set forth in the attached presentation. Upon approval by the Board, the grant budget will be submitted to NDE for review and approval. The ESSER III Fund monies are federal grant funds and Policy 3080 requires Board approval for the application for such monies.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
K. Receipt of Reports
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
L. Request for Closed Session
Rationale:
The Omaha Board of Education is authorized by state statute to hold closed sessions. Closed sessions may be held when clearly necessary for the protection of the public interest or for the prevention of needless injury to the reputation of an individual. Reasons that meet this standard include but are not limited to: (a) strategy sessions with respect to collective bargaining, real estate matters, pending litigation, or litigation which is imminent as evidenced by communication of a claim or threat of litigation to or by the public body; (b) discussion regarding deployment of security personnel or devices; (c) investigative proceedings regarding allegations of criminal misconduct; (d) evaluation of the job performance of a person when necessary to prevent needless injury to the reputation of a person and if such person has not requested a public meeting; and (e) legal advice.
Explanation
At this point, it is appropriate for the Board to meet in closed session for one of the stated matters and/or any other permissible closed session matters in compliance with the law. That the Board hold a closed session: 1. For strategy session with respect to negotiations/collective bargaining clearly necessary for the protection of the public interest or for the prevention of needless injury to the reputation of an individual in compliance with the law. 2. For strategy session with respect to property/real estate matters clearly necessary for the protection of the public interest or for the prevention of needless injury to the reputation of an individual in compliance with the law.
3. For strategy session with respect to pending litigation, or litigation which is imminent as evidenced by communication of a claim or threat of litigation to or by the public body clearly necessary for the protection of the public interest or for the prevention of needless injury to the reputation of an individual in compliance with the law.
4. For discussion regarding deployment of security personnel or devices clearly necessary for the protection of the public interest or for the prevention of needless injury to the reputation of an individual in compliance with the law.
5. For investigative proceedings regarding allegations of criminal misconduct clearly necessary for the protection of the public interest or for the prevention of needless injury to the reputation of an individual in compliance with the law.
6. For personnel and the evaluation of job performance clearly necessary for the protection of the public interest or for the prevention of needless injury to the reputation of an individual in compliance with the law.
7. For discussions of the legal consequences of specific action and legal advice clearly necessary for the protection of the public interest or for the prevention of needless injury to the reputation of an individual in compliance with the law. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
M. Adjournment
|