May 30, 2018 at 8:30 AM - Operations & Education Committee Meeting
Agenda |
---|
1. UNFINISHED BUSINESS
Rationale:
There is nothing on the table.
|
2. WILD NE/CREP REPORT
Rationale:
Dan Ourada is almost finished reseeding the grass land area of Czechland. We should have the billing for his services by Board meeting. This is cost-shared through Wild NE and Game & Parks.
|
3. OPERATION & MAINTENANCE & OTHER ITEMS
Rationale:
The O & M staff has been planting trees and should finish it week. Started watershed dam inspections and maintenance on the Swedeburg and Cottonwood dams and Rawhide Ditch. Cleaned out beaver dams at the Rawhide Ditch Diagonal, the silt dam at the tail end of Czechland Lake and below Cottonwood 6-E. Also routine vehicle maintenance.
|
3.A. Wanahoo SRA
Rationale:
The weekend camping at Lake Wanahoo is going well as most all camps sites are full. The lake level has been held one foot down (1209) or slightly lower all spring. All the over head lights are working properly, a previously report stated some were out or blinking.
|
3.B. Wanahoo Dam
Rationale:
Peerless Compaction Grouting has sent three options to which the joints in the spillway can be sealed;
Option #1 Pressure wash and prep joint with bonding agent
Option #2 Pressure wash and prep joint
Option #3 Pressure wash and prep joint
The cost for these options are; Option #2 - 300 LF of joint repair at $48.00 per LF - $14,400.00 Option #3 - 300 LF of joint repair at $64.00 per LF - $19,200.00 Peerless Compaction recommends Option 3 with this statement "We have had great success with Option 3 and this would be the one we recommend. We install ST-591 on a regular basis in wet conditions, we would actually have to wet the surface if it was dry to promote adhesion. This repair method was the process we used for Devin Biesecker and the LPSNRD". Also - "We can propose to install one or both on location and have you or the appropriate representative make the determination. We do not offer any warranties on these processes above a 1 year workmanship, however, we have used the ST-591 for many years and have not been called back due to failure". The Committee would like staff to inquire to other Engineering firms and concrete companies for possible solutions. |
3.C. Fremont Section 205
Rationale:
Letters were sent to our partners for reimbursement for this final Section 205 Study for non-structural planning. Inglewood has paid and the request is on the City of Fremont's agenda.
|
3.D. Tree Program
Rationale:
Tree planting should be completed this week. We planted at 13 different sites in five counties a total of 7,100 trees and shrubs.
|
3.E. Thorson Dam
Rationale:
John Thorson contacted the NRD with concerns regarding shoreline erosion on the face of the dam on his property. Mr. Thorson was also present for the Committee meeting. This dam is Swedeburg Site B-2. Heimann has inspected the dam and will be in contact with DNR Dam Safety to discuss this issue and others involving Swedeburg Dams.
Attachments:
(
)
|
4. ROCK AND JETTY
Rationale:
The end of the fiscal year is approaching, the Bank Stabilization budget is $10,000. We have spent $2,000 on Kay Poppe, $2,000 on Country Bros. LLC, withholding $1,566.13 for North Bend. If we assist North Bend, the spent budget would be $5,566.13 with $4,433.87 remaining.
Recommend paying Poppe an additional $50 to get it to 50% cost share, pay North Bend, pay Country Bros. LLC $4,383.87 to spend the Bank Stabilization budget.
Recommended Motion(s):
To assist the City of North Bend with a payment of $1,566.13 for the removal of trees on the North Bend levee, to assist Kay Poppe with an additional $50 to get her cost share to 50% of her bill and assist Country Bros. LLC with the remaining budget of $4,383.87 Passed with a motion by Board Member #1 and a second by Board Member #2.
|
5. INFORMATION AND EDUCATION
|
5.A. Information
|
5.A.1. Radio & eAds
Rationale:
The KTIC Radio Ad and Wahoo Newspaper eAd for June will feature the importance of having valid permits to chemigate.
Discussion:
|
5.B. Education
|
5.B.1. Recognition Banquet
Rationale:
The annual Recognition Banquet will be held on Sunday, June 24th at Czechland Lake Recreation Area. Social hour will begin at 5 pm, dinner at 6 pm, followed by awards at 7 pm.
Please RSVP by Friday, June 15th. |
5.B.2. Fertig Prairie
Rationale:
The Wachiska Audubon Society has invited the Lower Platte North NRD to a special open house event on the Fertig Prairie. The event will be on Saturday, June 30th from 2-4 pm. At 2:15 there will be an informal presentation with introductions and discussion. The official invitation letter is attached.
Attachments:
(
)
|
5.B.3. Education Programs
Rationale:
There are several education programs scheduled for June-July at Lake Wanahoo State Recreation Area.
The following event has been coordinated in partnership with Saunders County 4-H.
|
6. RURAL WATER SYSTEMS
|
6.A. Colon System
Rationale:
On 5/15 Elliott, Benal and Doukulil repaired the leak on the 4" main south of well. On 5/21 the same crew repaired a leak from an abandoned service line at the Johnson residence on Oak street.
Bills and testing completed as normal. |
6.B. Bruno System
Rationale:
Bills and testing completed as normal.
|
6.C. Other
|
7. Adjournment
|