October 12, 2020 at 6:00 PM - Regular Board of Directors Meeting
Agenda | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Call to Order
Rationale:
NOTE: The agenda is on file at the LPNNRD office and may be changed up to 24 hours prior to the meeting as scheduled.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.A. Meeting Notice
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.B. Inform Public on Location of Copy of “Open Meeting Act”
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.C. Pledge of Allegiance
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2. Roll Call
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2.A. Introductions
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3. Approval of Agenda
Rationale:
Are there any additions or corrections to the agenda?
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4. Comments - Advisors/Guests
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.A. Guest Comments
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.B. NRCS Report
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.C. NARD Report
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.D. NRC Report
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.E. Managers Report
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.F. Education Program
Rationale:
Kyle Overturf will present the 2020 Annual Audit.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5. Approval of Minutes
Rationale:
Are there any additions or corrections to the Board Meeting Minutes. If not they will be approve on the consent agenda.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6. Report of Standing Committees
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A. Executive Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.1. UNFINISHED BUSINESS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.1.a. Off Site Water Table Concerns Near Sand Creek
Rationale:
Our attorneys are preparing to file the summary judgment motion on the case and I am preparing to attend the October 14th mediation on behalf of the Lower Platte North NRD.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2. MEETINGS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.a. Pending
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.b. Reports
Rationale:
Hilger can report on the NARD Board Meeting held earlier in the week.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3. MANAGEMENT ITEMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.a. Directors Absence
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.b. Monthly Education Program
Rationale:
Kyle Overturf will give the Annual Audit report at the October Board Meeting.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.c. LARM Annual Payment
Rationale:
Attached find our 2020-2021 Renewal Invoice from LARM for our Commercial Property Insurance in the amount of $73,004.
The amount is $871 more than the renewal proposal due to just adding our 2020 3/4 Ton Chevy that we just received.
Recommended Motion(s):
To make payment of $73,004 to LARM for our Commercial Property Insurance effective 10/1/20 - 10/1/21 as attached to the Executive Committee Minutes Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.4. EQUIPMENT
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.5. PERSONNEL
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.5.1. Education Coordinator Position
Rationale:
Our current I&E Coordinator Lacey Sabatka and her husband TJ are expecting their first child on January 2nd. When Kara Nelson left the decision was made to wait until a later date to replace her position. Knowing Lacey will be gone for a period of time beginning in January, I believe it is time to move forward on advertising for the new position.
I will be sharing a handout with a list of responsibilities currently being assumed by our single I&E position. It is my recommendation to create the position of Education Coordinator and change Lacey's position to Information Coordinator. This will allow us to continue to grow our information and education outreach to all individuals in our district, young and old, and promote the department's mission of informing our district, "Who we are, What we do, Why what we do is so important and Where we are located." We have budgeted for this position this year and discussion is requested.
Recommended Motion(s):
To create a new position of Education Coordinator and bring a full job description to the Board Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6. FINANCE
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6.a. Union Bank Line of Credit
Rationale:
I have been contacted by Union Bank inquiring if we would like to renew our line of credit. If so, I will work with the bank and our accountants to prepare the paperwork and have ready for our November meeting.
The Executive Committee directed Management to work with Union Bank and Trust on renewing our Line of Credit |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6.b. Approval of Financial Reports
Rationale:
Attached find the August Financial Report. Grant will be available to go over the report with the Executive Committee.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6.c. Approval of Managers Time and Expense Sheets
Rationale:
Attached find Gottschalk's time and expense sheets.
Recommended Motion(s):
To approve Managers Time and Expense Sheets as attached Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6.d. Accounts over 90 Days
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6.e. Fiscal Year 2020 Audit
Rationale:
We are anticipating receiving the Annual Audit Report before Board Meeting. Kyle Overturn will be available at Board Meeting to discuss the Audit Report.
A motion will be needed at Board Meeting to accept and place on file the 2020 Audit Report as prepared and presented by Almquist, Malzahn, Galloway and Luth.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B. Operations Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.1. UNFINISHED BUSINESS
Rationale:
We do not have anything to address.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2. WILD NE AND OTHER PROGRAMS
Rationale:
We do not have anything to consider.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3. OPERATION & MAINTENANCE & OTHER ITEMS
Rationale:
The O & M crew sprayed problem brush areas on dams, sprayed Phragmites and other invasive plants. Continue to cut and treat trees at many locations. Regular maintenance items on vehicles and equipment. We have started the installation of ice monitoring camera brackets on Platte River Hwy bridges.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.a. Clear Creek Levee Repair by Corps of Engineers
Rationale:
We have not been notified as to whether the ROW markers, fence and staff gages have been installed. We have asked for a final inspection when completed.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.b. Wanahoo Stilling Basin - (FEMA)
Rationale:
FYRA is finalizing design with NeDNR Dam Safety and the contractor. The scheduled start date is still November.
The most current invoice of $16,960.50 was received from FYRA for their most current work on the Wanahoo Stilling Basin. The total contract invoiced to date is $98,193.95 out of a $98,200.00 contract. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.c. Clear Creek Fuse Plug at Camp Ashland (FEMA) and O & M Addendum Agreement
Rationale:
We received 50% or $14,641.66 of the local share from Lower Platte South NRD for the rehab of the Fuse Plug Levee in the National Guard Camp.
Staff is also engaged in the finalization of the O & M Addendum to the Inter-local Agreement between our District, Lower Platte South, Papio, and Army National Guard for the flood control structures within the National Guard Camp and the WSCC Levees. We held a video conference on Tuesday, Sept. 29. We hope to have this completed by early 2021. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.d. Cottonwood 21-A Emergency Spillway
Rationale:
Nothing has occurred since our last committee meeting. We believe Mainelli & Wagner are creating a design for NeDNR Dam Safety to review and also waiting on a Dam Safety Engineer to be put on staff by the NRCS in October.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.e. Wanahoo Auxiliary Spillway Crack Repair
Rationale:
Committee requested staff to contact a couple more contractors to possibly give a quote. One said they didn't repair or fill cracks and M.E. Collins is working on an estimate.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.f. Czechland Lake Report
Rationale:
During this calendar year we have received camping revenue of $15,000.
Staff did some maintenance on the two rock jetties by adding rock and beefing up the area around the sidewalk on one jetty. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.g. Recreation Area Hay
Rationale:
Dan Kadavy hayed the Homestead area and made 40 bales at an average weight of 1060 lbs. His bid was $65/ton. He paid the District $1,378.00.
We have not received any information from Czechland and haying continues or is near completion on the Wanahoo property. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.h. Vehicles
Rationale:
The 2020 3/4 ton Chevy we ordered via the State contract finally arrived in September.
We will proceed in selling the Jeep Patriot Sport 4x4 with 81,000 miles. We will start by asking for $7,950. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.4. ROCK AND JETTY
Rationale:
We have not received any information or request this past month.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5. LAKE WANAHOO
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.a. Lake Wanahoo Permit Sales
Rationale:
For the month of September, the District sold 152 annual permits for a total of $2,787.50. The 2020 numbers continue to be higher than 2019. For the same time period last year the District sold 118 annual permits for a total of $2,015.00.
Year to date, the District has grossed $95,295.00. In 2019 at this time the District had made $81,627.50. See Attached Spreadsheets
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.b. Lake Wanahoo Camping Revenue
Rationale:
For the month of September, the District received $7,849.01 in online reservation revenue and $6,781.00 in walk-up camping revenue.
For comparison, in 2019 the District made $6,471.38 in online camping revenue. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.c. Lake Wanahoo Education Building
Rationale:
During the month of September, the building was rented 24 times. 10 of those were full day events, and 6 were NRD or education-related meetings. Revenue for month of September was $1,100
Full Rental: 10 Day Rental: 9 Night Rental: 3 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6. INFORMATION AND EDUCATION
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.a. Information
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.a.1. Radio & eAds
Rationale:
KTIC Radio ad for October is featuring the voluntary cost-share program available to landowners in the Shell Creek Watershed to upgrade septic systems that have an open discharge (see attached).
Wahoo Newspaper eAd will be switched over in October with the attached ad.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.a.2. Analytics
Rationale:
Website
The top 5 pages remained the same for the month of September. Number of users decreased slightly. Desktop viewing increased again during September.
Facebook top posts: Earlier this week, LPNNRD staff helped plant native plants to spruce up the area south of the Lake Wanahoo Education Building (with pictures during the planting). According to LPNNRD General Manager Eric Gottschalk, because the property valuation for the district’s counties went up 5% from 2019’s valuation of $9,801,620,624 to this year’s valuation of $10,288,708,813, the tax levy went down 5% compared to last year’s rate of .035511. (Linked to article on Wahoo Newspaper site) https://bit.ly/33AZHUg The Lower Platte North NRD is dedicated to the conservation, preservation, and wise use of our natural resources. Nebraska's NRDs are charged under state law with 12 areas of responsibility. Learn more at lpnnrd.org (with picture for "Management and Conservation of Groundwater and Surface Water.)
Twitter top posts: The Lower Platte North NRD is dedicated to the conservation, preservation, and wise use of our natural resources. Nebraska's NRDs are charged under state law with 12 areas of responsibility. Learn more about soil conservation at http://lpnnrd.org (with Soil Conservation picture) The Lower Platte North NRD is dedicated to the conservation, preservation, and wise use of our natural resources. Nebraska's NRDs are charged under state law with 12 areas of responsibility. Learn more about the LPNNRD's recreation areas at http://lpnnrd.org (Outdoor Recreation picture) Almost a year and a half has passed since the devastating flooding of March 2019. The Clear Creek Levee took a hard hit, but the repairs are nearing the final touches. https://wahoo-ashland-waverly.com/ashland/news/clear-creek-levee-nearly-free-of-flood-damage/article_74adf514-e7c8-11ea-92a0-93f31c1fd834.html ...
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.a.3. Long Range Plan FY 2021
Rationale:
During the September 14 Board Meeting the approval of the Long Range Plan was tabled. Since the last Board Meeting there were minor additions made to the plan. The most current Long Range Plan was emailed to staff and Board for review. A motion is needed to remove it from the table for Board Action to approve.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.b. Education
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.b.1. September Education Programs
Rationale:
Land Judging
LPNNRD will be hosting the East Central Regional Land Judging contest on Tuesday, October 6th. There are over 200 students signed up to participate. If you are able to help, please Lacey know. Thank you to those who have contacted me that they are able to help! Classroom Activities
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.7. RURAL WATER SYSTEMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.7.a. Colon System
Rationale:
The Colon system had a positive coli form sample, as well as, a repeat sample testing positive. This requires a Level 2 Assessment to be completed by Elliott and our DHHS representative.
On 9/27 Elliott was notified of an leak in Colon. Upon inspection it appeared that there were potentially multiple leaks along the main on Spruce Street. Collins was contacted to assist with repairs due to possibility of extensive excavation. The leak was traced back to a pressure break on the main ~25' upstream from where the water was bubbling to the surface. Repair sleeve was securely placed and stopped the leak, Elliott flushed the downstream hydrant thoroughly after line was secured. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.7.b. Bruno System
Rationale:
Routine monthly sampling completed, meters read and bills have been mailed.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.7.c. Other
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C. Water Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1. UNFINISHED BUSINESS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2. REGULATORY
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a. GROUND WATER MANAGEMENT AREA
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.1. Variance Request in the Hydrologically Connected Area (Limited Development Area)
Rationale:
The District received 17 applications for new irrigated acres in the Hydrologically Connected Area. All applications listed on the attached table meet the 300 point ranking threshold. The 17 applications total 1,111 acres and account for 145.447 acre feet of new depletions.
Staff showed the list to the Committee and didn't see an issue with any of the variances.
Recommended Motion(s):
Recommend the approval of the 17 applications for 1,111 acres and 145.447 Acre Feet (AF) depletion. Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.2. Variance Requests in the Non-Hydrologically Connected Area (Normal Development Area)
Rationale:
One application was received prior to the August 15th deadline but was mixed in to the HCA applications. Randall Rasmussen has applied for a 17 acre expansion in the SE1/4SW1/4 S16-16-8E, Saunders County. This application had a ranking score of 370, and a total depletion of 3.825 acre feet.
Recommended Motion(s):
Recommend for approval the application in the normal development area for 17 acres with 3.825 AF depletion. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.3. Variance Requests in the Restricted Development Areas
Rationale:
Attached are the list of conditions for Roger Harders Variance approval. Staff sent this to Roger on September 10. Staff also had Katie review this area for thoughts on monitoring well location. That information is also attached.
Recommended Motion(s):
Recommend to approve the potential condition requirements for S23-14N-6E with the additional condition changes shown on updated version dated 10-7-2020 Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.3.A. Hollst Bros. RDA Expansion Application
Rationale:
Hollst Bros. have applied for an expansion of 62.5 acres from an existing well in S30-T15N-R9E, Saunders County, Restricted Development Area.Well G-069761 currently irrigates 200.23 acres and pumps out of the dakota aquifer which underlies the quaternary formation.
This application would fall under GWMA Rules & Regulations Section P Rule #1: "Rule 1: The District will allow expansion of new acres but does not allow for any more consumptive use in the RDA. Any development of new irrigated acres in the RDA shall be offset with an equal number of irrigated acres retired within the same aquifer subarea and shall be considered a transfer. The RDA areas within Lower Platte North NRD are on file in the District office and shown on Exhibit A." With a rolling allocation placed on the well of 27 acre inches, the additional 62.5 acres would set the rolling three year allocation at 20.58 acre inches.
Recommended Motion(s):
Recommend to approve this expansion of acres in the restricted development area, with no increase in consumption by implementing a 3-year allocation for 20.25 acre inches for well G-069761 on the 200.23 acres and the additional 62.5 acres. Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.4. Well Permit Program
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.4.A. Well Permits Approved
Rationale:
Wells Permits Approved: #
The total number of approved permits for 2020 is #
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.5. Cost Share Programs
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.5.A. Irrigation Well Sample Kits
Rationale:
312 kits have been sent out.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.5.B. Flow Meter Maintenance Program
Rationale:
Attached is an article on mechanical vs electronic meters along with LPN approved meters as of 11/11/2018.
Does the Committee want to revise the approved flow meter list? Committee and staff discussed the options and viewed the current list. The plan is to invite Lindsay Corp. to a Committee Meeting to discuss the meters they are offering. More discussion will continue throughout the fall and winter before a final list is updated.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.6. Bellwood Phase 2 Area
Rationale:
2020 is the eighteenth year for this Phase 2 Area. (In 2015 this area was reduced from 32 sections to 21 sections.) a
All sample results from Lab have been received. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.7. Richland - Schuyler Phase 3 Area
Rationale:
2020 is the fifth year of this Phase 3 Area. This Phase 3 area went into effect September 1, 2015. The 55 sections of this area first went into a Phase Area in 2004. The ten sections that were in Phase 2 are now in Phase 3. As such, the 2020 numbers (at bottom of table) are for 65 sections.
All sample results from Lab have been received. There are, however, two dozen kits to Phase 3 Area producers which have not yet been returned. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.8. GROUND WATER QUALITY SAMPLING
Rationale:
Some maps showing nitrates results. These are the samples that NRD staff collected.
Staff presented the nitrate maps showing the preliminary nitrate results from the water sampling conducted in summer 2020. The Committee is concerned on the percentage of wells over 15 ppm in the Schuyler-Richland Phase Area. It was recommended that staff should have discussions with public health officials for their thoughts on the nitrate issues. Staff will be contacting this group for future education to the Committee/Board.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3. GROUND WATER PROGRAMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.a. DECOMMISSIONED WELL PROGRAM
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.a.1. Well Estimates
Rationale:
# new wells has been reviewed and approved for decommissioning since the last Committee meeting.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.a.2. Plugged Wells
Rationale:
# wells have been plugged, reviewed, and ready for cost share payment approval this month.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.b. LOWER PLATTE NORTH NRD GROUND WATER STUDIES
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.b.1. Phase Area Update
Rationale:
Staff has been working directly with LRE/JEO on the Nitrogen Risk Management Tool. Here is some information from the conversations, which staff/committee can give some input. Attached is conceptual flow chart.
Staff showed the flow chart to the Committee and explained that after the assessment tool is developed, it can assists in identifying areas of greatest concerns in terms of contamination leaching. The nitrate assessment tool should help in placing best management practices in strategical locations. SWB Model
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.b.2. ELM Modeling Project
Rationale:
The LLNRD has had an account open for the Elm Modeling project that still had some cash in it. We have decided to close that account and distribute the money based on participation percentage back to the Districts.
You will be receiving a check in the mail that reflects those amounts. Don’t spend it all in one place! Thanks! Russ LCNRD - $400.92 LENRD - $2,502.30 LNNRD - $891.70 LPNNRD - $894.01 MNNRD - $760.37 UENRD - $3,023.04 ULNRD - $3,513.82 The Lower Platte North will be receiving $894.01 for its portion from LLNRD. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.c. Long Range Plan 2020-21
Rationale:
Staff explained the changes made to the Long Range Plan, which the Committee had no issue with. The Committee did discuss the process of implementing flow meters district wide. Staff explained that if the NET grant is approved for BMPs in the phase areas, the NRD would be offering cost-share to start the process of installing flow meters in these areas in 2021. Staff reported to the Committee, that at this time around 1000 wells are required to have flow meters and is in the process of getting about 2 dozens producers, since 2008, into compliance with this requirement.
Attached is the Long Range Plan that was presented at September Board Meeting. The Plan was tabled as concern was raised over the direction of a Board Member on Water Use within the District. Staff added these statements on page 11 (15) and 13 (17). To start the process of collecting accurate water use data to assist in future water studies and increase water consumption efficiency. 6. Integrated Water Management. Siting of potential recharge sites, storage reservoirs (both surface and groundwater), and potential water reuse projects to enhance the water supply in the District. Additional water use devices, monitoring wells, streamflow gauging, and precipitation sites will likely be necessary. Effects of climate change will also need to be considered as part of integrated water management. The following statement was already included on page 12 (16) Develop a groundwater model for each sub-area. Additional information on water use from all wells will be needed for accurate information. Is the Committee wanting to make a motion to install Water Use Devices District Wide? If yes, what would be the time table? Groundwater Rules and Regulation change? What is the purpose or justification to go District wide with Water levels, as a whole, still above trigger levels?
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.4. SURFACE WATER PROGRAMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.5. OTHER
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.5.a. COMMENTS FROM THE PUBLIC
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D. Projects Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.1. UNFINISHED BUSINESS
Rationale:
No unfinished business to address.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2. SWCP
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.a. SWCP Application Approvals
Rationale:
Recommended Motion(s):
To approve fall SWCP application from Norman Lindgren in the amount of $6,044.25. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.b. SWCP Payments
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.c. SWCP Cancellations
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.d. Wahoo Creek Cost Share Approvals
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3. WATERSHEDS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.a. Shell Creek
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.a.1. Shell Creek Environmental Enhancement Plan Implementation
Rationale:
No new information.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.a.1.A. Tom Sprunk Bank Stabilization/Wetlands Project
Rationale:
LPNNRD, LPNNRD & SCWIG have been assisting Tom Sprunk with selecting a contractor for completing his grade stabilization/wetlands project. Mr. Sprunk has been working with Wemhoff Construction on a bid for completing the project. Wemhoff has adjusted his bid to lower the total cost to $46,170.77 for completing the project. Jim Reedy, NRCS Project Engineer, has indicated that that price appears reasonable for work being completed at this time so Mr. Sprunk has notified the contractor to proceed. LPNNRD has approved 75% landowner assistance up to a maximum of $40,000 assistance. LPNNRD 75% would be $34,628 based on the projected project components. We will also provide 75% assistance for the seed which will be completed by the landowner.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.a.1.B. Shell Creek Grant Funding Update
Rationale:
No new information.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.a.1.C. Shell Creek Channel Improvement/Benching Project Update
Rationale:
Matt Bailey has reported that the North Channel (of the U.P. Railroad Bridge near County Road 15) portion of the Shell Creek Channel Improvement/Benching Project has been completed, including seeding. We anticipate recieving an invoice for payment soon. Colfax County continues to move toward completing the South Channel work and all landowners appear to be on board with project plan. Matt said that Pruss Construction will complete all of the south work immediately this fall, but hold off on work on property directly south of the bridge until a 404 permit is obtained.
The U.P. Railroad has said they will start work on their bridge replacement this November with plans to complete the project within the first quarter of 2021. The bridge replacement on county road 14 is moving along very well as it is anticipated that the bridge deck will be completed the week of October 5th. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.a.1.D. Shell Creek Septic System Upgrade Application
Rationale:
Recommended Motion(s):
To approve septic system upgrade within the Shell Creek Watershed Water Quality Improvement area to Jerry Korte in the amount of $4,800.00 Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b. Wahoo Creek Watershed
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b.1. Wahoo Creek Dam Site Planning Update & FYRA Invoices
Rationale:
NRCS has formally approved our agreement amendment to pay for the additional economics analysis they are requiring for the Wahoo Creek Watershed Plan. As authorized by Board, General Manager Gottschalk has signed the NRCS amendment and the contact amendment with FYRA for completing the work. Both executed amendments are attached.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b.2. Wahoo Creek Watershed Water Quality Plan Phase II
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b.2.A. Mike Chvatal Dam
Rationale:
The Mike Chvatal dam has been certified by NRCS staff and the contractor has submitted a bill. The total cost of the project came in at the bid price of $61,808.65. The Board had previously approved up to 75% cost-share on this project based off of the low bid of $61,808.65 up to total payment of $46,356.49.
Recommended Motion(s):
To approve $46,356.49 payment to Mike Chvatal for his completed dam within the Cottonwood Creek watershed. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b.3. Olsson Design Update and Invoice
Rationale:
No new information. We anticipate an invoice from Olson by the Board Meeting.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4. JOINT WATER MANAGEMENT ADVISORY BOARD
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.a. North Bend Drainage District Project
Rationale:
FYRA continues to assist the North Bend Drainage District, Dodge County, Fremont and LPNNRD on the FEMA assistance application. Things have been going favorable so far as it appears the cost benefit ratio will be more that 1:1 that is required for potential assistance.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.b. Platte River Breach Repair Project (Rod & Gun Club)
Rationale:
The involved partners (Fremont, Dodge County, Fremont Rod & Gun Club & LPNNRD) have been obtaining official approval on the Agreement that was passed by LPNNRD on September 14 (attached). JEO has been selected as the project engineering firm and the next step will be for the partners select a contractor though the bidding process.
We also received the Fremont Rod and Gun Club's signature on the agreement (attached). The Club is asking that the following be considered as the project moves forward: John Miyoshi, Club President , sent the following suggestions for a future amendment to be considered by Fremont, Dodge County and LPNNRD. "My Board has one request that can be handled by one of the following two suggestions:" 1. An amendment to the Agreement on item #2 adding language that would name all four signees as fiscally responsible. (or) 2. In each of the two mentioned contracts have all four amendment signees listed.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.c. Platte River Camera/Sensor Project
Rationale:
All partners (Fremont, Dodge County, PMRNRD, and LPNNRD) have approved the Interlocal Agreement to establish cameras and water sensors at key locations along the Platte River. We are planning to install five cameras and two sensors in October-November after FEMA approves funding for the project which is anticipated soon.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5. NEBRASKA BUFFER STRIP PROGRAM
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5.a. Nebraska Buffer Strip Program Payments
Rationale:
*Denotes final contract year.
Recommended Motion(s):
To approve the 20 listed Nebraska Buffer Strip Program contracts for annual payment totaling $24,364.29 Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5.b. Nebraska Buffer Strip Program Applications
Rationale:
Recommended Motion(s):
To approve the six Nebraska Buffer Strip Program applications to Rezac Farms Inc totaling 15.9 acres and $3,528.22. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.6. HAZARD MITIGATION PLAN UPDATE
Rationale:
As has been reported earlier, our District-wide Hazard Mitigation Plan has received FEMA approval that now allows potential FEMA funding assistance for all entities that have participated in our plan. Related additional tasks associated with the Plan (Fremont & Schuyler Parcel Level Flood Risk Assessments and the Dam Breach Overall work) have been completed or nearly complete. Attached is JEO's final $4,262.50 invoice for work completed under components approved under our contract totaling $236,100. NEMA will reimburse LPNNRD 75% ($3,196.88),
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.7. EROSION AND SEDIMENT RULES AND REGULATIONS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.8. OTHER
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.8.a. Johnson Lake Aeration Project Update
Rationale:
Don Cunningham reported that October 1st, is installation day for the aeration system. TNT electric is bringing power to the lake shore as well. He has Victory Marine contributing the boat to get the aeration system to the center of the lake and two Fremont firemen scuba divers to anchor it to the bottom. Their playground will also be finished on Thursday. They have a celebration planned at the Lake on Saturday, October 3rd.
We may receive a payment request by the October 12th Board Meeting. Attached find bills for the fountain electrical totaling $9,411.96 the NRD agreed to pay 50% which is $4,705,98. A motion will be needed to pay this amount.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.8.b. NRCS 2020 Conservation Accomplishments in LPNNRD
Rationale:
Attached is Mark Walkenhorst's (NRCS District Conservationist) report on conservation practices completed in 2020 within the LPNNRD.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.8.c. Wolfe Project Repair Update
Rationale:
As you recall, in 1995, LPNNRD sponsored an eight jetty project on Dan Wolfe property located about four miles south of Richland on the Platte River. This project was completely destroyed by the 2019 flooding. The original total project cost was approximately $110,560 (low bid), with NRCS emergency funds covering 75% of the expense. LPNNRD provided a maximum of $13,820, Dan Wolfe provided up to $8,820 and Colfax County $5,000. The project was to not only help prevent Platte River floods from destroying landowners property, but also to protect county roads. One of the biggest concerns at the time was the possibility of a large Platte River flood event flowing north into Lost Creek and eventually flood portions of Schuyler.
Since 2019, we have have numerous discussions with the landowners and Colfax county about pursuing the repair/replacement. LPNNRD also has worked with FEMA/NEMA to potentially access approximately $800,000, which would represent 75% assistance for projects along the Platte River. Colfax County has taken the initial lead by attempting to bring Schuyler in as a potential partner and work with Northeast Economic Development District on the possibility for receiving a community block grant to assist with the 25% local share of a potential project. From recent indications from Colfax County, it appears that Schuyler has not expressed much interest in being a project partner and receiving community block grant funds to assist with the local cost share doesn't look very promising. We have asked the county to make a final decision very soon about whether or not they want to pursue a project, as the time to move forward with FEMA funding is growing short. There might be a possibility of using the available funds toward another project, but it is unclear what that might be at this point.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7. Additional Action Items
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7.A. Shell Creek Environmental Enhancement Payment
Rationale:
20-C-3 Randy Brabec - $711.86 - Grass Waterway
Randy Brabec - $1386.00 - Lands for Conservation To pay Randy Brabec $2,097.86 for his Grass Waterway project and Lands for Conservation Payment. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8. Approval of Bills Pending
Recommended Motion(s):
Motion to approve bills pending as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9. Consent Agenda Adoption
Recommended Motion(s):
Motion to approve Consent Agenda as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10. Comments from Directors/Guests
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11. Meeting Establishment/Adjournment
Rationale:
NOTE: The agenda is on file at the LPNNRD office and may be changed up to 24 hours prior to the meeting as scheduled. |