September 29, 2022 at 8:30 AM - Operations Committee Meeting
Agenda | ||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. UNFINISHED BUSINESS
Rationale:
We have no unfinished business to consider.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
2. WILD NE AND OTHER PROGRAMS
Rationale:
Schomer and Heimann met with members of Ducks Unlimited and NE Game & Parks on the Wanahoo Wetland Enhancement Project in the area of our dirt barrow area. A Ducks Unlimited surveyor will get elevations of the entire area sometime before December. Detailed plans will then be developed on how much area will be excavated and where materials will be deposited on site. The NRD and G & P would like to prescribe burn the area in late winter/early spring of 2023. Then control the vegetation by either mowing (if dry) or aerial spraying. Estimated construction in the Fall of 2023. Area map attached.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
3. OPERATION & MAINTENANCE & OTHER ITEMS
Rationale:
O & M staff continues to remove trees from all of our public grounds and project areas. A beaver dam on the Rawhide Diagonal ditch culverts was removed.
Heimann accompanied the Corps of Engineers on their annual inspection of the Clear Creek Levee system. The inspection went well with no major infractions. The RCC crack contractor, Fisher Building Services, is on the job filling cracks in the Wanahoo RCC auxiliary spillway. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
3.A. Wanahoo Stilling Basin - (FEMA)
Rationale:
The Wanahoo stilling basin apron floor project is currently being advertised. A list of contractors have been notified of the project. The design and specs have been reviewed by DNR Dam Safety. A pre-bid site showing took place on Wednesday, Sept. 28th at 10:00 with three contractors present. The bid opening is Oct. 5 at 2:00 pm at the LPNNRD office. LPNNRD approves a bid or rejects all bids at the Board Meeting Oct. 10.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
3.B. NRD Owned Thomas Lake Lots
Rationale:
The Thomas Lake Homeowners Association has drafted some new by-laws for the lots the District proposes to sell. Staff will contact the Association's president for more discussion regarding future use. Our new easements allow for removable items such as tents and RV's to be used on the four lots on the Thomas Lakes high ground. New HOA rules will not allow removable items. Not allowing removable items may affect the price of the lots. We may move forward with a sale in the next couple of months or after the first of the year.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
3.C. Prescribe Burn Association
Rationale:
Staff would like to become a member of the Pheasant Forever Bohemian Alps Burn Association ($25). It was also mentioned that the District could possibly make an annual donation to the PBA for their use in purchasing equipment or repairs. A donation may also be an incentive to assist in burns annually on the Wanahoo property. Find their Prescribed Burn Unit Activity Report Form attached.
There is an Interlocal Cooperation Act Agreement between LPNNRD, NGPC and PF for the operation & maintenance of Lake Wanahoo and Pheasant Forever Wetland areas (see attached). Item 3.b. in the agreement states how LPNNRD, G & P, PF will work together to provide labor, technical assistance, and equipment for controlled burns. Even though there's an interlocal agreement saying they should be assisting, it doesn't mean the district can't contribute to expenses for their work and assistance in helping other landowners care for their grasslands.
Recommended Motion(s):
To make a donation of $1,500 to the Bohemian Alps Burn Association for their use in purchasing and/or repairing equipment associated with prescribe burns and to reevaluate our donation annually Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
3.D. Olsson Professional Services for Wanahoo Dam
Rationale:
Attached is a proposal from Olsson's for Professional Services Wanahoo Dam Instrumentation Monitoring, (see Scope of Services). The agreement covers three years; January 2023 - December 2025. The cost for this contract for services is $56,469.35, of which $1,869.35 is for additional services on the previous contract related to the evaluation and consultation on the pressure relief wells.
In the previous contract, the District did not elect to do Task II unless it was necessary. Olsson's is now stressing that Task II is important for these reasons; 1) Recent changes to the outlet channel, including additional pressure relief wells, will impact the models and warning conditions. 2) The yellow flag elevations are based on now-outdated models and will likely change with respect to reservoir pool elevations.3) With the history of collected instrumentation measurements, we can now develop a more accurate prediction of the dam’s stability based on actual measurements. A dam is a dynamic system, and understanding and predicting its behavior requires on-going analysis with up-dated data.
Recommended Motion(s):
To approve Olsson's Professional Services for Wanahoo Dam Instrumentation Monitoring over the next 3 years at $54,600.00 and to pay $1,869.35 for services from the previous contract Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
3.E. Grass Drill Rental Schuyler Co-op
Rationale:
The District received payment of $535.35 from Schuyler Coop for grass drill rental during the first half of the year. Nine cooperators used the grass drill.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
3.F. Cottonwood Dam Assessments 21-A & 7-A
Rationale:
JEO has completed a draft of the dam assessments on Cottonwood 21-A and 7-A through the NRCS Dam Assessment Program. The NRCS cost-share for construction is 65%. We are awaiting DNR Dam Safety review of the reports. The reports will then be reviewed by NRCS. (Attached is a segment of the report explaining the Rehabilitation Alternatives and cost and also an aerial of the design change to the auxiliary spillway.) The Dept. of Natural Resources Dam Safety lists 21-A as "Unsatisfactory Condition". Alternatives for Cottonwood 21-A as follows:
Alt-1 - Restore Auxillary Spillway, Raise Top of the Dam, & account for an additional 100 years of sediment life, estimated cost of $4,540,000. Alt-2 - Replace Spillway System with Weir & Box Culvert, & eliminate the auxiliary spillway, estimated cost of $4,200,000. Alt-3 - Realign Auxillary Spillway & Roadway, Evaluate Sediment Storage, estimated cost of $1,750,000. ($1,390,000 - $2,500,000). Alt-4 - Non-Federal, Replace Principal Spillway w/ Box Culvert & Restore Auxilliary Spillway, Do not Increase Sediment Storage, estimated cost of $3,340,000. Alt-5 - Non-Federal, Realign Auxillary Spillway & Roadway, Do not increase sediment storage, estimated cost of $890,000. Federal alternatives need a 100 yr design life both for sediment storage and for materials used. JEO has modified Alternative 5, which could potentially get federal dollars, some items or changes can sometimes be negotiable. NRCS will review and in the next phase of Planning & Design some strict criteria may be negotiable and the exact rehab may or may not be one of the ones listed. There are more steps or phases we must discuss with NRCS. Alternatives for Cottonwood 7-A are as follows: Alt-1 - Increase Design Life by Increasing Storage Capacity, estimated cost of $5.5 - 6.5 million. Alt-2 - Increase Design Life by Periodic Sediment Removal, estimated cost of $22.1 - 43.1 million.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
3.G. Conservation Tree Price
Rationale:
The District currently charges $1.00/tree for hand plants and $2.00/tree for machine planting. Bessey Nursery has raised their prices .05, charging .87/ tree for 2023. In the past two years, Bessey has raised their price .09. The out of state nurseries we order from have also raised their prices and charge anywhere between .83 to over $1.00/tree.
Recommended Motion(s):
To raise the Districts Conservation Tree prices to $1.25/tree for hand plants and $2.50/tree for machine planting Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
3.H. Recresation Area Hay Harvest
Rationale:
Dan Kadavy completed haying the Homestead Lake area. He had 66 bales at a total weight of 42 tons. He over paid at a rate of $82.50/ton, his bid was $81.00/ton. He will be reimbursed $57.59. His total payment to the district is $3,421.44.
Ken Cejka hayed a portion of Wanahoo. He had 83 bales at a total weight of 51 tons. His bid was $88.00/ton, he paid the District $4,488.00. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
4. ROCK AND JETTY
Rationale:
We have not received any requests for payment or applications. Information regarding 404 permitting was sent to one cooperator.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
5. LAKE WANAHOO
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
5.A. Lake Wanahoo Permit Sales
Rationale:
For the month of August, the District received $2,902.50 in park permit revenue. The year by year break down of annual permit sales is listed below.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
5.B. Lake Wanahoo Camping Revenue
Rationale:
For the month of August, the District received $15,626.91 in camping revenue. The year by year comparison is listed below.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
5.C. Clint Johannes Education Building
Rationale:
During the month of September, the building was rented 24 times, with 2 NRD events. Revenue for the month was $1,460.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6. INFORMATION AND EDUCATION
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A. Information
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.1. Radio & eAds
Rationale:
September’s KTIC Radio ad and Wahoo Newspaper e-ad continued with the variance request applications, then switched after the 15th to promote the NRD’s three recreation areas.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2. Analytics
Rationale:
Analytics
The LPNNRD Facebook/Twitter pages, and the website are the fastest and low-cost ways to get information out to the public. Tracking analytics are a way to see if people are seeing the information and what ways seem to be most effective. If you are on Facebook or Twitter, please like, follow, share, or retweet the Lower Platte North NRD posts! Total reach/impressions show how many people saw the post/tweet. Engagements include likes, comments, shares/retweets and link clicks.
Top Posts on Facebook and Twitter: • Pictures from the Range Judging contest at Camp Moses Merrill • Pictures and an article from the Highboy Cover Crop Interseeding Project (HiCCIP) demonstrations • PATH program open at Wanahoo • Drought monitor comparison to 2012
Traffic channels: organic traffic means they use a search engine then choose an option that includes lpnnrd.org, direct traffic means they type in lpnnrd.org directly (or have it bookmarked), and referral traffic is any other traffic not from a search engine or social (such as a link from another site). Social clicks: 5 from Facebook, 0 from Twitter. Referral clicks: 16 from NARD, 10 from Visit Nebraska, 4 from ad on Wahoo Newspaper’s site. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3. Long Range Plan
Rationale:
The Long Range Plan recent draft is attached. The final copy will be prepared for approval at the October Board Meeting.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B. Education
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.1. Past Events
Rationale:
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2. Future events
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7. RURAL WATER SYSTEMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.A. Colon System
Rationale:
On 9/12 the RWD was notified of a leak in the village of Colon. ME Collins repaired the leak.
The village has been upgrading the phone lines the past month which has required more line locations (19 total locates) and construction inspection as the new lines were bored. Routine monthly sampling completed, meters read and bills in the mail 9/30. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.B. Bruno System
Rationale:
On 9/2 the RWD was notified of a leak at the Waste Connections landfill. The leak was caused by a failed gasket within the meter pit. The gasket was replaced by RWD staff.
The RWD has been working with JEO and Black Hills Energy over the past month planning for gas line expansion that will cross/parallel our water line east of David City. Routine monthly sampling completed, meters read and bills in the mail 9/30 |
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.C. Other
|