January 9, 2023 at 1:30 PM - Regular Board of Directors Meeting
Agenda | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Call to Order
Rationale:
NOTE: The agenda is on file at the LPNNRD office and may be changed up to 24 hours prior to the meeting as scheduled.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.A. Meeting Notice
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.B. Inform Public on Location of Copy of “Open Meeting Act”
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.C. Pledge of Allegiance
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2. Roll Call
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2.A. Introductions
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2.B. Oath of Office
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3. Approval of Agenda
Rationale:
Are there any additions or corrections to the agenda?
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4. Comments - Advisors/Guests
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.A. Guest Comments
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.B. NRCS Report
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.C. NARD Report
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.D. NRC Report
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.E. Managers Report
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.F. Education Program
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.G. Nominating Sub-Committee Report
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5. Approval of Minutes
Rationale:
Are there any additions or corrections to the Minutes? If not they will be approved on the consent agenda.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6. Report of Standing Committees
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A. Executive Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.1. UNFINISHED BUSINESS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2. MEETINGS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.a. Pending
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.a.1. Legislative Conference
Rationale:
I have the following Directors registered for the Legislative Conference:
Jerry Johnson Bob Hilger Bill Saeger Kelly Thompson Registration deadline is January 4th. Please let Breunig know if you are interested in attending. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.b. Reports
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3. MANAGEMENT ITEMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.a. Directors Absence
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.b. Monthly Education Program
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.c. Nominating Sub-Committee Report
Rationale:
Attached find the Nominating Sub-Committee Minutes.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.d. LPNNRD Office Update
Rationale:
JEO has provided a proposed agreement for professional services as we move forward with our new office project. Corey Bordersen and his team will be available to answer questions you may have as we proceed to the next phase.
Recommended Motion(s):
To authorize Chair to sign Agreement between LPNNRD and JEO Architecture, Inc. to provide Design, Bidding and Construction Admin Services for the LPNNRD new office facility. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.e. Retainer Agreement - Bromm, Lindahl, Freeman-Caddy & Lausterer
Rationale:
Attached is our one year retainer agreement for our legal services with Bromm, Lindahl, Freeman-Caddy & Lausterer. The price/charges remain the same as last year.
Recommended Motion(s):
To authorize Chair to sign the retainer agreement with Bromm, Lindahl, Freeman-Caddy & Lausterer effective January 1, 2023 to January 2024. Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.f. DNR Surface Water Full Relinquishment
Rationale:
Attached find a Full Relinquisment of Surface Water Appropriation from Department of Natural Resources for the appropriation the LPNNRD has on Sand Creek. Staff will work with DNR to get the necessary paperwork turned in.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3.g. Director Vacancy
Rationale:
With the passing of Director Mike McGinn the Board will need to declare a vacancy in Sub-District 3 and appoint a nominating Sub-Committee to find a replacement.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.4. PERSONNEL
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.5. EQUIPMENT
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6. FINANCE
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6.a. Approval of Financial Reports
Rationale:
Grant presented the November Financial Reports to the Executive Committee.
Recommended Motion(s):
Motion to approve Financial Reports as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6.b. Approval of Managers Time and Expense Sheets
Recommended Motion(s):
Motion to approve Managers Time and Expense Sheets- Attachment Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.6.c. Accounts over 90 Days
Rationale:
Attached find the November Accounts Receivable Report.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B. Operations Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.1. UNFINISHED BUSINESS
Rationale:
We have nothing to consider for unfinished business.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2. WILD NE AND OTHER PROGRAMS
Rationale:
Nothing new to report.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3. OPERATION & MAINTENANCE & OTHER ITEMS
Rationale:
The O & M staff has been cutting & treating trees on recreation areas and Clear Creek Levee. We hauled rip-rap and dirt to a Swedeburg dam to protect some erosion on the toe of the dam. Equipment and truck maintenance.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.a. Wanahoo Stilling Basin - (FEMA)
Rationale:
All directors are receiving updates via email from Eric Suing of FYRA/Houston Engineering. M.E. Collins has installed all the re-bar in the apron floor of the basin. They have also removed the old baffle plate at the toe of the baffle wall. When the new floor is poured, a new plate will need to be added. This plate will have to be fabricated and may take 6 weeks. There's a Change Order No.1 (attached) for the removal and replacement of the baffle plate at a cost of $45,758.48 and a diagram (attached).
Also, in the change order, the substantial completion date of 12/31/22 has been changed or extended to 2/28/23. Committee members and staff questioned why the baffle plate re-design wasn't in the original design, knowing the old plate was damaged and the floor would be taken down 9-12". Also, what equipment is being re-mobilized that wouldn't be used in other future construction on site? Ethan Miller of FYRA/Houston will be available at Board Meeting.
Recommended Motion(s):
To approve the Wanahoo Apron Floor repair Change Order #1, The removal and replacement of the baffle plate at a cost of $45,758.48 and extension of the substantial completion date to 2/28/23 Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.b. NRD Owned Thomas Lakes Lots
Rationale:
Attached is a location map of the six lots the NRD owns at Thomas Lakes. The two south lots are located on the Clear Creek Levee and the four northerly lots are on the high ground tied to the levee.
The Thomas Lakes HOA Bylaws define the lots as unusable and they can not be built on. Since 2010, the lots have been considered Community Green Space. Included in their rules, regulations, and covenants, these lots are to be maintained as to trash debris and overgrowth, Not be used for any overnight camping with a tent, No temporary storage buildings or sheds, No vehicle storage including campers or trailers, No fencing or other restrictive barriers, and No livestock boarding. HOA has an interest in purchasing the lots but would be conservative in their bid. They would prefer that the NRD continue ownership w/ the HOA continuing the upkeep of lots 41-44. By selling the lots, they would be put back on the County tax roll. Options: 1) sell all six lots, 2) sell only the 2 south lots since they are directly on the levee and the 4 would remain as they are under the care of the HOA & District, 3) don't sell any lots and remain as is. The committee and staff would like our legal counsel to write a letter to the Thomas Lakes HOA before their January meeting stating the District's disapprove of their regulations specified for the NRD owned lots.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.c. Ron Morrissey Irrigation Letter
Rationale:
Find attached a draft letter to Mr. Ron Morrissey in regard to surface water irrigating from Sand Creek. The letter states that Mr. Morrissey will contact the Dept. of Natural Resources if and when he feels he is short of water. The District will then follow the NDNR directive in regard to releasing water from Lake Wanahoo.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.d. Grass Drill Rental Saunders County
Rationale:
Rezac Seed sent payment of $217.20 for drill rental from July to December. They had a $81.20 credit from the first half of the year for drill repairs.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.4. ROCK AND JETTY
Rationale:
We received an invoice from Doug Ritthaler for $5,300 for jetty repair work on the Platte River in Saunders County. The district assist at 50% or $2,650.00.
Recommended Motion(s):
To pay Doug Ritthaler $2,650.00 for jetty repairs on the Platte River in Saunders Co. pending staff inspection. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5. LAKE WANAHOO
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.a. Lake Wanahoo Permit Sales
Rationale:
For the month of November, the District received $15.00 in annual park permit revenue. The year by year break down of annual permit sales is listed below.
Permit sales for 2023 have started and the initial returns are very positive.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.b. Lake Wanahoo Camping Revenue
Rationale:
For the month of November, the District received $1,641.37 in camping revenue. The year by year comparison is listed below.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.c. Clint Johannes Education Building
Rationale:
During December, the building was rented 12 times with 2 NRD events. Revenue for the month was $700.
The new rates will begin on January 1, 2023. Online materials have been updated, and print materials are in the process of being updated. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6. INFORMATION AND EDUCATION
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.a. Information
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.a.1. Radio & eAds
Rationale:
December's KTIC Radio ad and Wahoo Newspaper e-ad continued with the water reports deadline.
January's KTIC Radio spot is attached - featuring the upcoming Nitrogen Certification classes for producers. January's Wahoo Newspaper E-ad is attached - features the 2023 Wanahoo permits available.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.a.2. Analytics
Rationale:
The LPNNRD Facebook/Twitter pages, and the website are the fastest and low-cost ways to get information out to the public. Tracking analytics are a way to see if people are seeing the information and what ways seem to be most effective. If you are on Facebook or Twitter, please like, follow, share, or retweet the Lower Platte North NRD posts!
Total reach/impressions show how many people saw the post/tweet. Engagements include likes, comments, shares/retweets and link clicks.
Top Posts on Facebook and Twitter: • Trivia event flyer • Accepting tree orders • Drought monitor map • 2023 Wanahoo permits available • December Coffee Lakeside flyer
Traffic channels: organic traffic means they use a search engine then choose an option that includes lpnnrd.org, direct traffic means they type in lpnnrd.org directly (or have it bookmarked), and referral traffic is any other traffic not from a search engine or social (such as a link from another site). Social clicks: 64 from Facebook, 5 from Twitter. Referral clicks: 31 from NARD, 10 from NGPC, 7 from ad on Wahoo Newspaper’s site. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.a.3. News Channel Nebraska
Rationale:
In January we will feature the I&E video on News Channel Nebraska.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.b. Education
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.b.1. Past Events
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.b.2. Future Events
Rationale:
Working on expanding our outreach through different avenues, such as recording previous presentations to get onto our YouTube channel, scheduling more classroom visits, and starting to prep for the annual Spring Conservation Sensation. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.7. RURAL WATER SYSTEMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.7.a. Colon System
Rationale:
Routine monthly sampling completed, meters read, bills mailed 12/29.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.7.b. Bruno System
Rationale:
On 12/23 the RWD was contacted by David City utilities in regards to the Bruno watertower being frozen and apparently leaking (pic attached). DC was contacted by Bruno board member about water supply to the tower, which we operate. Elliott met with Bruno water operator and village board members to safely shut off supply to tower and develop a plan of operation until tower thaws.
Updates 12/29 (second pic) 1/3 (third pic) Routine monthly sampling completed, meters read, bills mailed 12/29. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.7.c. Other
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C. Water Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1. UNFINISHED BUSINESS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2. REGULATORY
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a. GROUND WATER MANAGEMENT AREA
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.1. Well Permit Program
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.1.A. Well Permits Approved
Rationale:
Wells Permits Approved: #
The total number of approved permits for 2022 is #
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.2. Phase Area Update
Rationale:
The committee and staff had a lengthy discussion on nitrogen management and the best options for moving forward. Staff showed the committee the different options for boundaries with the question of why some years more samples were collected. The staff does spot checks yearly and extensive sampling periodically. The staff did extensive sampling work in 2001-03, 2011-12 and 2019-20. The committee felt staff should do extensive sampling in Summer 2023 and re-discuss boundaries after the analysis is complete.
The committee discussed health issues and making people aware of the water quality issues in private domestic wells. Phase 4 could be the long-term solution but short-term options should be considered, like RO units. This topic will be discussed later on in the Water Resources Agenda. The committee and staff discussed soil sample analysis results and discrepancies. If Phase 4 is moved forward, what minimum amount of nitrogen application will be needed, as producers are supposed to follow UNL nitrogen recommendation equation. One current soil sample showed 190 pounds of residue carryover in one part of the field while another area was around 42 pounds. A different field with high organic matter showed 140 pounds of nitrogen credits. When staff works with these individuals, what will be the right recommendation? The committee and staff discussed a public meeting in February or March with local producers to explain what is being considered would be appropriate. They thought if producers' wives could attend it would be helpful, so they could understand the situation. The committee realized that the reporting date would have to be adjusted, so staff could work with current soil sampling analysis. A pledge by the producer with a nitrogen plan would put practices on paper, that the producer might be willing to change. Shown below are the requirements for Phase Four Water Quality Management Area. Options 3, 4 and 5 boundaries would meet the requirements for moving forward. (Options attached) Section I Groundwater Quality Management Area - Phase Four Rule 1 Phase Four Criteria When levels of nitrate-nitrogen exceed 15.01 parts per million, or levels of other human induced non-point source contaminants exceed 100% of the MCL or LHAL, a Phase Four area will be declared. Within the same aquifer; boundary setting for Phase Four Areas will be initiated when: water quality analytical results within a minimum 9 square mile area are at identified trigger levels for a minimum of 2 sampling events. The area must contain a minimum of 10 registered wells and contaminant trigger levels must be exceeded in over 50% of the wells. When irrigation wells are not available, other wells may be used. Initial investigation by the District will be to determine if the contamination is a result of point-source or non-point source pollution. If non-point source pollution is found to be the reason, more intensive investigation for boundary setting will ensue. If a Wellhead Protection Area should be established due to non-point source pollution, the District may set boundaries that are less than 9 square miles. After the establishment of a Phase Four Area, if non-point source contamination levels should decline, two consecutive sampling events below the trigger levels are needed before the Area could be placed in Phase Three, Phase Two or Phase One. Rule 2 Continuation of Phase One, Two and Three Rules A continuation of Phase One Rules as defined in Section E, Rules 1-6, Section F, Rule 2, Phase Two Rules as defined in Section G, Rules 3, 4, 5, 8, 9, 10 and 11, Phase Three Rules as defined in Section H, Rule 4. Rule 3 Fertilizer Application On All Soils Split application of commercial nitrogen fertilizer is required with 80 pounds maximum applied before May 1. Rule 4 Nitrogen Recommendations Nitrogen applications must not exceed District Recommendations. Application data may be required to verify the amount of nitrogen that is applied to the field(s) within the management area. Rule 5 Well Metering Flow meters are required on all high capacity wells. Rule 6 Acre-Inch Allocations A rolling acre-inch allocation, in 3-year increments, will be put into place by the District and will be based on the aquifer subarea, crop planted, irrigation distribution system, percent decline of the aquifer, water use of the aquifer, climatic conditions, net corn crop requirements, and discretionary factors. Rule 7 Staff Assistance NRD Staff will work directly with individuals on Best Management Practices. Staff may spot check fields before May 1 by collecting a soil sample to monitor Rule 3. Questions?
Recommended Motion(s):
Recommend extensive water sampling by staff in Summer of 2023 within Schuyler-Richland Water Quality Management Area with consideration for boundary and next steps for a Phase 4 Management Area after results are analyzed. Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.3. Richland - Schuyler Phase 3 Area
Rationale:
2022 is the seventh year of this Phase 3 Area. This Phase 3 area went into effect September 1, 2015. The 55 sections of this area first went into a Phase 2 Area in 2004. The ten sections that were in Phase 2 are now in Phase 3. As such, the 2020, 2021 and 2022 numbers (at bottom of table) are for 65 sections.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.4. Bellwood Phase 2 Area
Rationale:
2022 is the twentieth year for this Phase 2 Area.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.5. LPNNRD Operator Certification
Rationale:
Attached is a list of classes for 2023.
Does the Committee want to move forward on issuing Cease and Desist Orders to owners/operators that have let their Nitrogen/Irrigation Certification Card lapse? The process would be sending certified letters to individuals notifying them of the violation and when the hearing would take place. Another option would be changing the rule that a NRD issued card is required to purchase fertilizer. Jovan commented that this could be a rule that the NRD could implement. The concern would be enforcement and cooperation with fertilizer dealers. The Committee felt that obtaining a Nitrogen/Irrigation Certification Card should be enforced, as this rule obligation by the NRD is not that time-consuming. The class is a pro-active approach by the NRD to present best management practices that a producer could use within their operation. There was some discussion about local or state control on nitrogen management. A hearing is scheduled for Tuesday March 28 for individuals who are not in compliance, Attached is a draft example of the letter that was sent out on Thursday, January 5.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.6. Groundwater Management Plan - LPNNRD
Rationale:
Discussion at the Water Committee Retreat that the 1994 Management plan should be updated and condensed. Does the Committee want to have an outside firm write and assemble or should staff attempt to do it in-house? Advantages of having an outside firm is the perception and at public meetings they can facilitate with all parties. The disadvantage is the cost to the District, which could be 20 to 50 thousand.
The Committee would like a sub-committee of 2 Water Committee members and 2 staff to review the plan for condensing and decide what would be the best action to update. The Committee will decide on members after new Committee alignments. The following items were brought up with no discussion in committee. Other items discussed at the Retreat:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.7. Cost Share Programs
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.7.A. Soil Moisture Sensors
Rationale:
Attached is an approved application and invoice from Brian Sanderson. The application allows for 50% up to $750 for Advanced Soil Moisture Sensor Technology.
Recommended Motion(s):
Recommend approving payment to Brian Sanderson for $750 for Soil Moisture Sensor Incentive Program. Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.7.B. Flow Meter Maintenance Program
Rationale:
Staff explained how meter maintenance worked and with batteries dying in-season made water use accuracy a challenge. If the NRD was going to cost-share more meters and potentially have other areas with allocations, this could become more of an issue. Some producers like the convenience of remote meter reading with pivot and nozzle controls. Idea discussed was to replace batteries with a 2-year rotation instead of 4. More discussion will occur at future Committee meetings.
Flow meter maintenance and batteries. The meters with batteries seem to have more issues, with some batteries dying in season, so no accurate reading is obtained. Either don't allow them at all or require that remote access be given to NRD staff with warning text or email. Tri City meter maintenance is scheduled to maintain the meters in the northwest part of the district. They have had a late start due to training new employees and the cold snap that we just experienced.Typically they start right after harvest. Currently in the third year of the meter maintenance cycle. They document and take pictures of the meter and its reading. On mechanical meters, they re-grease the bearings; check if the bearings are still good; make sure the cable isn't stripped or rounded off, it ties into the register and makes the dials/tumblers turn. They make sure the propeller isn't damaged; the magnets aren't cracked or damaged; replace the gasket; no vibrational damage; no water damage. On battery powered flow meters, they simply replace the battery and replace the dry packs. Site visits are paid by the LPNNRD. $60.00 per mechanical site visit and $75.00 for electronic meter site visit. If the meter is damaged and needs further repair, they can repair the flow meter in the field and that bill is between Tri City and the producer/owner. Currently, on the battery powered meters, the LPNNRD absorbs the cost of the battery and then invoices the producer/owner for reimbursement. At the moment, this isn't a tall task because there are only 100 electronically powered meters in the district. If this number grows exponentially, it would be cumbersome to staff time to track down the reimbursements. Flow meter reporting: Reporting deadline was December 15th. As of 12/28/22, we have had 750 meter readings reported to us (including livestock). Nearly 400 flow meter readings are still needed from irrigation wells. Postcards were sent out earlier this year in Mid-September, which was suggested last year. A reminder email was sent out to the producers, who had given us an email in the past. Municipalities, industries, and livestock that are required to report also have had reminders sent out to them (this list included approximately 175 wells). They have until January 31st to report their usage. District Approved flow meter list: Attached is the current list Install requirements on all mechanical flow meters: without straightening vanes, 10 upstream pipe diameters from any bend or valve and 1-2 downstream from any bend or valve. With bolts in straightening vanes, 5 upstream pipe diameters and 1-2 downstream. With in-line flow straightener, 1.5 pipe diameters upstream and 1-2 downstream. On ARAD group installs, they should install to the specs of the manufacturer/flow meter manual. Mechanical Meters: Advantages- no power needed; can be maintained; accurate if operating correctly; preventative maintenance once every four years helps to ensure they are operating smoothly and calculating correctly. Disadvantages- no easy way of using telemetry or having it tied into the producers' pivot panel so they can connect it to an app on their phone to see how much they are pumping. If it is installed too close to a well head that is powered by an engine it could be susceptible to vibrational damage. If this occurs, relocating the mechanical meter is the only solution to ensure that no more damage occurs and the meter records accurately. Electronic meters: Advantages- can use telemetry and the producer can visualize if the pivot/well is operating correctly and they can see how much that they are applying virtually without being at the site. Disadvantages- Needs power to record data; an unknown is how long the sensor is good for? Is this calculation correct? If using direct power from the pivot panel or another source of electricity, the battery can be used as a back up. Batteries are changed on a four-year basis. I have had phone calls saying their batteries have died; there is no way of knowing what they pumped. If connected to a direct source of power, how are we to know that it was plugged in at the beginning or end of the season? If power is lost in either form, the totalizer will not count or be updated when reconnected. If a well is allocated, it could open a loophole. Electronics and water are not a good combination. Staff suggestions for the district approved list: -McCrometer propeller meter with mechanical register; no battery powered/electric digital screens. -No on any battery/external powered flow meter; -No to battery powered meters (looking down the road if 3,000 meters need to be installed.) How useful will the information be if a battery dies and we don't know what was pumped, especially in drought years with allocations. If the producer says they are going to use external power and have the battery as a backup, how is the staff going to keep up with these "checkups"? -ARAD Group & Carlon; for subsurface drip; industrial; livestock (these meters are typically indoors and not exposed to the elements of mother nature. -Geyser propeller meter; no digital screens. - Or if we do allow digital powered propeller meters/sensor meters, they must be powered externally and if they are found not working or fail to report to the NRD that the meter isn't working they could be subjected to a reduction in their allocation. Questions for Committee: 1. Prop Meters with mechanical totalizer (McCrometer/Geyser) 2. Prop Meters with Digital readouts (McCrometer) 3. Electromagnetic meters with digital readouts (Valley 3000, Lindsay Growsmart, Sparling)- A water suitability sample will be required to show water quality results before choosing this meter. It needs to have low concentrations of Iron and Manganese and other dissolved solids in order to allow it to be installed. The producer must also allow the NRD remote access to see if the battery/external power is hooked to the meter and for the NRD to see if the meter is functioning. If not reported to the NRD, the producer would get a warning for non-compliance. After that, if the well is in an allocated area, the well could be subjected to a reduction in its allocation. 1",2",3"? 4. Turbine Meters (ARAD Group and Carlon)- for subsurface drip, livestock , industrial uses.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.b. GROUND WATER QUALITY SAMPLING
Rationale:
Attached is a map showing the results from sampling that NRD staff conducted in the summer of 2022. The purpose of the sampling is to see if the results can identify why some areas within the Schulyer-Richland Area had lower nitrate results. The map does have some interesting results with higher uranium and the potential of surface and groundwater connections.
Dan Snow - UNL Water Center comments are shown below. "It seems likely that several wells close to the river draw on groundwater with active denitrification, while others show iron reduction (possibly releasing uranium). Nitrate reduces to nitrogen gas (N2) through the following pathway through microbial denitrification: NO3-> NO2-> N2O-> N2. Detecting nitrite (NO2) and nitrous oxide (N2O in some wells is a good indicator of active microbial denitrification. 15N in residual nitrate will be enriched (increased) along with 18O during microbial denitrification. Iron reduction occurs when most of the nitrate is used up and sulfate reduction followed by methanogenesis happens under even more reducing conditions." Questions for Committee and Board? The NRD sometimes test low nitrates in a water sample, but finds out later that another contaminant is high. Should we offer testing for other potential contaminants? Costs? A state cost-share program for Reverse Osmosis Units (RO) is being offered through NDEE. One of the requirements is certified laboratory results for nitrates to be eligible. In the past, the NRD has assisted District residents with obtaining nitrate water sample results. Lower Elkhorn NRD is offering cost-share on RO units, if not approved by state program grant. (attached) The committee agreed that staff should continue to assist people with nitrate water sampling for domestic wells and to make them aware that other contaminants might be in the water, even if nitrates are low. The Committee would like to discuss a cost-share program for Reverse Osmoisis Units (RO) for individuals at budget time.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.c. LIVESTOCK WASTE PERMITS
Rationale:
The LPNNRD has received # 1 livestock permit applications from DEQ since the last Water Committee meeting.
Description of permit application
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3. GROUND WATER PROGRAMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.a. DECOMMISSIONED WELL PROGRAM
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.a.1. Well Estimates
Rationale:
1 new wells has been reviewed and approved for decommissioning since the last Committee meeting.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.a.2. Plugged Wells
Rationale:
1 wells have been plugged, reviewed, and ready for cost share payment approval this month.
Recommended Motion(s):
Recommend payment of $737.44 to David Proskovec, Butler County, for decommissioning of irrigation well. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.b. LOWER PLATTE NORTH NRD GROUND WATER STUDIES
Rationale:
Attached is the RFQ for Hydrological Assessment Geodatabase, which was part of the WSF grant received in November 2022. This is a step that was overlooked to complete the necessary data to develop the groundwater model. This RFA was sent out or emailed to firms on Thursday, January 5, 2023.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.b.1. Eastern Nebraska Water Resources Assessment (ENWRA)
Rationale:
An invoice for $30,000 is attached from ENWRA for dues per contract. This year LPNNRD is eligible to receive $9150 for well monitoring equipment and test holes. The plan is to unitize this money for equipment in the new monitoring well north of Richland along with updating older data loggers. A check will be mailed in January.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.b.2. Lower Platte River Consortium
Rationale:
The next meeting will be January 17, 2023 at 10 am, planned for the NEDNR building at Fallbrook in Lincoln.
Attached is the Drought Map from December 29. What are the thoughts of the Committee on moving forward on drought information or scenarios? The committee thought staff should continue to inform people about water conservation.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.4. SURFACE WATER PROGRAMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.5. OTHER
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.5.a. COMMENTS FROM THE PUBLIC
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D. Projects Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.1. UNFINISHED BUSINESS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2. SWCP
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.a. SWCP Application Approvals
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.b. SWCP Payments
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.c. SWCP Cancellations
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.d. Wahoo Creek Cost Share Approvals
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3. WATERSHEDS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.a. Shell Creek Watershed
Rationale:
On 12/6 a SCWIG meeting was held in the Columbus FO. Meeting consisted of planning next phase of NDEE 319 grant funding. Septic systems are still a major item on the budget. Urban BMPs projects within the watershed (Newman Grove, Schuyler, etc) were discussed and a meeting 1/17 with partners is planned.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.a.1. Shell Creek Implementation - 319
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b. Wahoo Creek Watershed
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b.1. Wahoo Creek Dam Site Planning Update
Rationale:
Staff are having conversations with Olsson to get a RFP drafted for hiring a land acquisition firm.
Staff have had multiple conversations with landowners, primarily within first three sites (26AB, 27) about additional wetland and stream mitigation work, overall project timeline, and potential land rites negotiations. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b.1.A. Olsson Design Update and Invoice
Rationale:
December Invoices and progress report are attached and will be paid per agreement.
On 12/14 Chapman, Elliott, Caleb P (Olsson), and Matt Wray (ACOE) met to discuss mitigation plan as part of the Corps permitting process. The plan to permit the project through one permit was discussed and ok'ed with the understanding that the first 3 (26AB, 27) will have a firm plan at time of permitting and the second 7 sites will have a plan to be determined before construction. Current timeline for permitting review/approval from Corps is the March-April timeframe. When asked about possibility of altering the Corps perpetuity requirement for all permits we could not get a definitive answer either way. It was suggested, as planned, to seek an amendment or an exception to Executive Order.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b.1.B. NeDNR Agreement JEDI Funds
Rationale:
We expect Director Riley's signature on the agreement this week.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.b.2. Wahoo Creek Watershed Water Quality Plan - 319
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.c. Skull & Bone Creek
Rationale:
Spoke with NRCS regarding what is required to update the plans. A short letter is all that is needed to request WFPO planning funds. The letter must state the problem(s) - flooding & water quality. The watershed should be less than 250,000 acres. Skull Creek watershed is 62,248 acres and Bone Creek watershed is 35,923 acres so we could do both together. NRCS is pretty backlogged and short on staff at the moment, so it will take roughly a year before planning gets underway. We are at least 10 years from moving dirt if everything goes perfectly.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4. JOINT WATER MANAGEMENT ADVISORY BOARD (JWMAB)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.a. East Fremont/Elkhorn Township Drainage - FEMA HMPG
Rationale:
Nothing new to report as JEO continues to finalize alternatives analysis and JWMAB partners work out fiscal responsibilities/plans.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.b. West Fremont - FEMA BRIC
Rationale:
Nothing new to report since plan kickoff meeting was held 11/22.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.c. Rawhide Creek Watershed - NRCS WFPO
Rationale:
On 12/19 JEO, JWMAB met with NRCS to update on the status of WFPO plan and alternatives analysis. Previous alternatives review guided JEO, JWMAB from pursuing Platte river flood impacts as those costs exceeded the WFPO limits. Current plan focuses on Rawhide only impacts and main alternatives are two detention ponds (Merlyn England and Airport) as well as Fremont cut off road raise.
Dodge county (as lead sponsor) also had to request planning extension for WFPO which expires in March '23. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.d. North Bend Drainage Ditch repair - FEMA
Rationale:
On 12/21 a meeting was held to update JWMAB on NBDD repair. Currently the design is being reviewed by NDOT, at request of NEMA, before NEMA/FEMA will do final review. Plan is for construction to begin next spring. FYRA/Houston is the contracted consultant.
Of note: Total project cost estimate: $1,633,357.47 FEMA cost share 75% = $1,225,018.12 Local cost share 25% = $408,339.35
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5. HAZARD MITIGATION PLAN UPDATE
Rationale:
JEO assisted us with drafting and submitting the grant to NEMA. After two reviews, the grant was accepted by NEMA and submitted to FEMA on 12/29/2022. We expect to be awarded funds in approximately one year.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.6. MORSE BLUFF LEVEE
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.7. WOLFE JETTY
Rationale:
The City of Schuyler has been approached to lead the project and they seem receptive. Director Bailey and County Commissioner Carl Groteluechen plan to follow up with the City at their next council meeting.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.8. LESHARA DRAINAGE IMPROVEMENT
Rationale:
The Village of Leshara received CDBG funds to assist with a drainage project. At the LPNNRD Board Meeting on 7/12/2021, the NRD approved the motion "To budget $31,000 in FY 2022 and another $31,000 in FY2023 to assist Leshara with their Drainage Improvement Project". CDBG funds were released in July and the project is underway, consisting of 3 primary efforts:
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.9. LOWER PLATTE RIVER CORRIDOR ALLIANCE
Rationale:
FY23 LPRCA dues and USGS Real-Time Water Quality Monitoring at Leshara invoice is attached. The invoices will be paid based on previous Board motions.
2/10/2022 = Recommend to approve and have Board Chainman sign the joint funding agreement for real-time continuous water quality monitoring in Lower Platte River at Leshara for 3 years. Lower Platte North NRD share will be $6,400 in FY23, $5,320 (FY24) and $4,360 (FY25). 6/13/2022 = To discuss with the full Board about becoming a LPRCA contributing member and budget $1,000 for FY23 annual dues.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.10. EROSION AND SEDIMENT RULES AND REGULATIONS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.11. PLATTE CENTER - ELM CREEK
Rationale:
On June 13th, 2022 the LPN Board passed the motion "To approve and budget $4,125 (50% of $8,250 in FY 2023 for additional channel improvement of Elm Creek banks to reduce floodwater erosion, provided a 404 permit is obtained by the Village, if required, prior to construction." We received an invoice from Platte Center requesting $2,013.00 which is 50% of total projects costs $4,026.00. Staff spoke with Mark Borchers and he indicated a 404 permit was not required. The invoice will be paid based on the June 2022 board motion.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.12. TRAILS
Rationale:
Rail with Trail proposal and request from Jason Buss, President of Nebraska Trails Foundation.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.13. OTHER
Rationale:
Keiser Impoundment
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7. Additional Action Items - None
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8. Approval of Bills Pending
Recommended Motion(s):
Motion to approve bills pending as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9. Consent Agenda Adoption
Recommended Motion(s):
Motion to approve Consent Agenda as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10. Comments from Directors/Guests
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11. Meeting Establishment/Adjournment
Rationale:
NOTE: The agenda is on file at the LPNNRD office and may be changed up to 24 hours prior to the meeting as scheduled. |