February 2, 2023 at 8:30 AM - Operations Committee Meeting
Agenda | ||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. NOMINATIONS FOR CHAIR AND VICE CHAIR
Rationale:
The Committee needs to nominate and elect an Operations Committee Chair and Vice Chair. Mark is not eligible as he is the Board Treasurer.
The chair will run the committee meetings and participate on the Executive Committee. The vice Chair will substitute in the absence of the Chair. Seier nominated Pollard for Chair and Johnson for Vice-Chair, seconded by Saalfeld. The vote was unanimously in favor. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
2. UNFINISHED BUSINESS
Rationale:
Nothing to consider for unfinished business.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
3. WILD NE AND OTHER PROGRAMS
Rationale:
Nothing to report.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
4. OPERATION & MAINTENANCE & OTHER ITEMS
Rationale:
The O & M crew burned multiple tree piles at Czechland Lake and one at Wanahoo, and also continued cutting trees on recreation areas.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
4.A. Wanahoo Stilling Basin - (FEMA)
Rationale:
The final three panels were poured on Friday, January 27. The baffle plate may arrive in February for installation and grading and seeding will take place after the thaw. See Eric Suings reports via email for all the construction information.
Attached is the invoice from Houston Engineering and a pay application #2 for M.E. Collins that came in before the last Board meeting and was paid. Also attached is Change Order 002 dealing with the extra cost of $45,506 for overgrinding of the RCC Apron Floor and $5,048.56 for steel reinforcement along with some deducts totaling $46,448.24. A Technical Memorandum is attached for an explanation. Also, find pay application #3 for Collins w/out Change Order 002 ($247,298.97) and with CO 002 ($292,798.07) attached. Change Order No. 001 for the Baffle Plate Replacement was approved for $44,358.91 following the last Board meeting. Baffle plate fabrication may take 4-5 weeks.The substantial completion date was also moved to March 7, 2023. The final completion date is April 28, 2023. Ethan Miller and Eric Suing were present at the Committee meeting.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
4.B. Cottonwood 21-A Dam Assessment
Rationale:
NRCS informed staff at the NARD Legislative Conference that funding was approved for the rehab of Cottonwood 21-A but, with the Federal deficit at its ceiling, there may be cuts. We will wait to hear from or meet with NRCS to figure out the next step in the process.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
4.C. Wanahoo Relief Well Cleaning
Rationale:
Last summer, the District cleaned 7 of 29 listed relief wells on Wanahoo at a cost of $63,600. This year Olsson's has 10 listed to be cleaned. The cleaning process for the 29 wells is over a 4 year period. (See Attachments)
Do we want to obtain a bid from Rieschick Drilling Co. for 10 or lower the number to be cleaned? The staff would prefer to stay with Rieschick since they have onsite experience. Last year we had four interested well drillers but only received two bids. The Committee directed staff to negotiate with Rieschick Drilling on a long term (3 year) contract for the remaining 22 wells with the understanding that there would be some inflationary cost increase. If an agreement is arranged, then we would ask for a motion to proceed.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
4.D. NRD Owned Thomas Lakes Lots
Rationale:
Representatives of the Thomas Lakes Homeowners Association will be present to explain their regulations for unusable lots and to answer questions. A map is attached.
Their listed rules, regulations, and covenants for these lots are to be maintained as to trash debris and overgrowth, Not be used for any overnight camping with a tent, No temporary storage buildings or sheds, No vehicle storage including campers or trailers, No fencing or other restrictive barriers, and No livestock boarding. After much information and discussion on how the HOA takes care of the four north lots (on high ground) and uses them as public green space, the committee made a motion to have staff re-write an agreement with the HOA to continue this practice and not sell the six lots. Staff would like to reconsider selling the two south lots on the Clear Creek Levee as the District is responsible for O & M on the levee, which should not be used as public green space.
Recommended Motion(s):
To have staff re-write an agreement with the Thomas Lakes Home Owners Association for the care and public green space use of lots 41, 42, 43, 44, 49 and 50 Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
4.E. Sand/Duck Dam 15 Land Locked Issue
Rationale:
This landlocked item was previously mentioned at our December meetings. Jason Scott (was present), the owner of an 8.5 acre land locked parcel at Sand/Duck Creek Dam 15 (aerial attached) has a solution to cross the creek, rather than attempting to obtain an ingress/egress easement from his neighbors (Ourada's). Attached is a photo of a UTV bridge made by Geneva Welding. The estimated cost of the bridge is $4,800. Mr. Scott's total estimate for the bridge and installation is $8,000. He is asking the District for cost-share assistance on the project.
Funds can be used from the Bank Stabilization budget.
Recommended Motion(s):
To approve cost-sharing with Jason Scott at 50% up to $4,000 to place a bridge over the creek of Sand/Duck Creek Dam 15 to reach a landlocked parcel for maintenance purposes Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
4.F. Dams Exceeding Planned Service Life
Rationale:
NRCS sent out a notice to the District last year that we have 20 dams exceeding their planned Service Life of 50 years (attached). Lower Platte North has 43 flood control dams, of which 3 are High Hazard and 7 are Significant Hazard. This is information to keep in mind regarding possible rehab costs in the future.
The Dept. of Natural Resources Dam Safety inspects High Hazard dams once a year, Significant Hazard every 3 years and the rest every 5. The District O & M staff inspects and does maintenance on our dams once a year unless there's a high precipitation event in their respective watershed.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
5. ROCK AND JETTY
Rationale:
We don't have any applications or pay request at this time.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6. LAKE WANAHOO
Rationale:
2023 Planning and Future Additions Update:
Staff has asked JEO to submit a new design and construction estimate for a fish cleaning station to be located on the west side of the park, near the boat ramp. We will also start plans for a general store to be located near the fish cleaning station. Partnerships, and or management, are still to be determined. The City of Wahoo is waiting for the ground to thaw before they bore an electric line to run power for the new light at the education building parking lot. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A. Lake Wanahoo Permit Sales
Rationale:
For the month of December, the District received $6,185.00 in annual park permit revenue. The year by year break down of annual permit sales is listed below.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B. Lake Wanahoo Camping Revenue
Rationale:
For the month of December, the District received $2,276.95 in camping revenue. The year by year comparison is listed below.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C. Clint Johannes Education Building
Rationale:
During the month of January, the building was rented 10 times with 1 NRD event. Revenue for the month was $955.00.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7. INFORMATION AND EDUCATION
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.A. Information
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.A.1. Radio & eAds
Rationale:
January's KTIC Radio spot is attached - featuring the upcoming Nitrogen Certification classes for producers. February’s spot is also attached - featuring the 2023 Wanahoo permits.
January's Wahoo Newspaper E-ad is attached - featuring the 2023 Wanahoo permits. This will continue through February.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.A.2. Analytics
Rationale:
The LPNNRD Facebook/Twitter pages, and the website are the fastest and low-cost ways to get information out to the public. Tracking analytics are a way to see if people are seeing the information and what ways seem to be most effective. If you are on Facebook or Twitter, please like, follow, share, or retweet the Lower Platte North NRD posts!
Total reach/impressions show how many people saw the post/tweet. Engagements include likes, comments, shares/retweets and link clicks.
Top Posts on Facebook and Twitter: • Reverse Osmosis grant through NDEE • Upcoming Nitrogen Certification Classes • Promoting Tree Sales • LPNNRD "Why does and 85-Year-Old plant a tree?" video • January’s Coffee Lakeside flyer
Traffic channels: organic traffic means they use a search engine then choose an option that includes lpnnrd.org, direct traffic means they type in lpnnrd.org directly (or have it bookmarked), and referral traffic is any other traffic not from a search engine or social (such as a link from another site). Social clicks: from 46 Facebook, from 4 Twitter. Referral clicks: 48 from NARD, 12 from Visit Nebraska, 11 from NGPC, 1 from the ad on Wahoo Newspaper’s site. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.A.3. Winter Viaduct
Rationale:
The Winter issue of the LPNNRD's Viaduct is en route to local newspapers and will be distributed by mid-February. The newsletter is inserted in the following newspapers:
Wahoo/Ashland/Waverly Market Weekly Fremont Tribune North Bend Eagle David City Banner-Press Schulyer Sun Columbus Area Choice (3 rural routes) Humphrey Democrat Albion News Total of 22,095 delivered copies, and 365 online subscribers. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.A.4. News Channel Nebraska
Rationale:
The I&E video was featured on News Channel Nebraska during January. The cost was $475. Attached are the times the video and our logo aired. The total amount of the video and logo aired was 200 times.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.A.5. Shell Creek Watershed Supplies Request
Rationale:
Attached is a list of items the Shell Creek Watershed testing group would like to have purchased for the 2023 testing season. The amount totals $1,609.75.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.B. Education
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.B.1. Past Events
Rationale:
Slow month with Christmas Break and students in and out of school. Survival club was supposed to be on the 19th; due to a snow day, it was pushed to Friday, February 3rd. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.B.2. Upcoming Events
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
7.B.3. New Projector for the Education Building
Rationale:
The current projector at the Clint Johannes Education Building projects presentations at a low quality. Diode Technologies has given us a proposal for a BenQ 1080p 5,000 Lumen Projector to replace it. The new projector will cost $3,059.00. Below is the breakdown of costs:
Recommended Motion(s):
Motion to move forward with purchasing the BenQ 1080p, 5,000 lumen projector at $3,300.12 from Diode Technologies. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
8. RURAL WATER SYSTEMS
Rationale:
Elliott has been working on the annual NDEE update/reporting for Emergency Contact Plans, Sample Site Plans, for both RWDs.
We have also started the RWDs vulnerability assessments and are working with the Nebraska Rural Water Association (NeRWA) through the process. The new Lead Service Line Inventory (LSLI) guidance has been received and the RWD has begun the initial steps. All public water systems (PWS) are now required to complete the LSLI for their respective systems and are to be filed with EPA by the end of 2024. Information for inventories can be difficult as there is minimal data about old, residential service lines. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
8.A. Colon System
Rationale:
Routine monthly sampling completed, meters read and bills mailed 1/31.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
8.B. Bruno System
Rationale:
Routine monthly sampling completed, meters read and bills mailed 1/31.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
8.C. Other
|