September 8, 2014 at 6:00 PM - Regular Board of Directors Meeting
Agenda | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Call to Order
Rationale:
NOTE: The agenda is on file at the LPNNRD office and may be changed up to 24 hours prior to the meeting as scheduled.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.A. Meeting Notice
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.B. Inform Public on Location of Copy of “Open Meeting Act”
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.C. Pledge of Allegiance
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2. Roll Call
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2.A. Introductions
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3. Approval of Agenda
Recommended Motion(s):
Approve the agenda as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4. Comments - Advisors/Guests
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.A. Guest Comments
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.B. NRCS Report
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.C. NARD Report
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.D. NRC Report
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.E. Managers Report
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4.F. Education Program
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5. Approval of Minutes
Recommended Motion(s):
Approve minutes as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6. Report of Standing Committees
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A. Executive Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.1. MEETINGS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.1.a. Pending
Rationale:
The NARD Fall Conference is scheduled for September 21-23 in Kearney. The following Directors are registered to attend: Hilger, Johannes, Kavan and Pieke.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.1.b. Reports
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.1.b.1. SWCS Report
Rationale:
Attached find Mountford's SWCS Meeting Report from Lombard, IL.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2. MANAGEMENT ITEMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.a. Directors Absence
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.b. Bob Weaver
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.b.1. Monthly Conference Call and Update
Rationale:
Weaver's monthly report is attached to the Executive Committee Minutes. The monthly conference call was held on September 5th.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.b.2. Monthly Bill
Rationale:
The August Weaver bill is attached to the Executive Committee Minutes. A motion to approve the monthly bill of $3,300 is appropriate.
Recommended Motion(s):
*Approve payment of the August Weaver bill in the amount of $3,300 and bill LPSNRD and Papio NRD for thier share. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.c. Monthly Education Program
Rationale:
Katie Camoron our ENWRA Coordinator will give a program on HEM (Helicopter Electromagnetic Mapping) and the planned flight lines for this fiscal year.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.d. CCEI Lawsuit
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.e. NARD Fall Conference Resolutions
Rationale:
Attached find the NARD voting procedure and three resolutions that were submitted for discussion at Fall Conference.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.f. Water Leaders Acadamy
Rationale:
Director Joe Birkel is interested in participating in the Nebraska Water Leaders Academy this next year. The cost is $2,000. Director Saalfeld participated in 2013 and encourages others to attend.
Recommended Motion(s):
*Approve participation of Director Joe Birkel in the 2015 Nebraska Water Leaders Academy and pay the initial $1,500 fee and authorize Birkel to submit the final $500 cost with his quarterly directors expenses. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.2.g. Committee Meeting Dates and Board Retreat
Rationale:
Director Ruzicka has asked to review the Committee Meeting Dates for January/February and Director Retreat which is normally scheduled for February.
Suggested Dates:
Recommended Motion(s):
*Set the January and February Committee Meetings and Director Retreat dates as listed: Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.3. EQUIPMENT
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.4. PERSONNEL
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.5. FINANCE
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.5.a. Approval of Financial Reports
Rationale:
We will not have a Financial Report until after all adjustments are received from HBE. HBE is planning on attending the October 3rd Executive Committee Meeting followed by the Audit Sub-Committee Meeting.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.5.b. Approval of Managers Time and Expense Sheets
Rationale:
Attached find time and expense sheets from Manager Miyoshi. A motion to approve them is appropriate.
Recommended Motion(s):
*Approve Managers Time and Expense Sheets as attached to the Executive Committee Minutes. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.5.c. Accounts over 90 Days
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.A.5.d. Setting F.Y. 2015 Tax Rate and Budget
Rationale:
Last month budgeted income was set at $10,759,263 and our expenses at $11,115,098. Below is a summary of where we are:
Recommended Motion(s):
Set the F.Y. 2015 Tax rate at .047231 and approve Budgeted Expenses of $11,115,098 and the State Budget as attached to the Executive Minutes Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B. Education, Operations & Rural Water Systems Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.1. WILD NE/CREP REPORT
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.1.a. Wild NE, WHIP, Contract Payments
Rationale:
No new payments.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.1.b. CREP Payment(s)
Rationale:
No new payments.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.1.c. New Contract(s)
Rationale:
No new contracts.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2. OPERATION & MAINTENANCE & OTHER ITEMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2.a. O & M Crew
Rationale:
The O & M staff has been shredding at Homestead, Czechland, Sand/Duck Creek 2, Cotterell & Ames levees, and Rawhide Ditch. We are currently on Rawhide. We sprayed for Sericea Lespedeza with the tractor sprayer and backpack on the Wanahoo dam. Cut some larger volunteer trees before shredding.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2.b. Fremont 205 Feasibility Study
Rationale:
The District has not heard from the COE regarding any progress or the amount of funds needed to finish the study.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2.c. Wanahoo Recreation Area
Rationale:
Game & Parks staff will start transplanting trees with a tree spade after Labor Day. Reservations for camper pads are 100% full for the Labor Day weekend.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2.d. Lake Wanahoo, Czechland & Homestead Haying
Rationale:
Haying is completed at Homestead, Chuck Andell paid $1,544 for 19.3 acres, at Czechland Dennis Prochaska paid $2,573.55 for 33.25 acres. Mike Luben owes $465.75 for 5.75 acres and Chris Meduda on the Wanahoo area is not finished.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2.e. Grass Drill Revenue
Rationale:
We received $1,647.50 from Schuyler Coop for Drill Revenue. This payment reflects rental through August 4, 2014.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2.f. Wahoo Chapter Ducks Unlimited
Rationale:
The two portable duck blinds are currently being put together and will be located on Lake Wanahoo this weekend for the upcoming youth mentor hunting season.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2.g. PL 566 Dam Assessments
Rationale:
The NRCS conducted their assessments on Clear Creek 22-A and Bellwood 2-C on August 19th. Heimann & Mountford accompanied the NRCS on Clear Creek 22-A. A preliminary verbal report indicates no major issues with the structures, but it is uncertain regarding inundation downstream.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.2.h. Homestead Lake Grassland Enhancement Grant
Rationale:
A Wild Nebraska grant proposal by the NE Game & Parks Commission to enhance the grassland areas at Homestead Lake and keep it a viable wildlife management area is proposed. The Federal Aid grant would help eliminate invasive trees and renovate grasslands. The grant will assist at 75% cost-share, the estimated total cost currently is $15,116 and will not exceed $30,000. Game and Parks still has to gain Federal Aid approval, when this happens we will then approve a 10 year contact to do the work.
Recommended Motion(s):
*Agree to have NE Game & Parks proceed with the planning of this Homestead Lake Grassland Enhancement, Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3. ROCK AND JETTY
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.a. Applications
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.3.b. Payment Request
Rationale:
There are no payment requests for bank stabilization.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.4. EROSION & SEDIMENT RULES & REGULATIONS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5. INFORMATION AND EDUCATION
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.a. Information
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.a.1. KTIC Ads
Rationale:
This month we are running ads on the variance application deadline and the Lake Wanahoo detour.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.a.2. eAds
Rationale:
This month we are running an ad notifying people of the upcoming detour at Lake Wanahoo.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.a.3. Viaduct
Rationale:
The fall print edition of the Viaduct newsletter will go to papers in mid- to late September.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.a.4. SCWIG Open House
Rationale:
An Open House will be held at the Platte Center Auditorium on Thursday, September 18, 5:30-7:30 to discuss the final “geomorphic assessment” report and its recommendations. A news release was sent to Nebraska Farmer and other local media, and a poster was developed to place in coffee shops, co-ops, etc.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.b. Education
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.b.1. David City High School Water Quality Testing
Rationale:
We will be assisting David City High School classes with a water quality assessment in the David City Park. Students will collect and test samples and do a survey of aquatic life in the pond.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.c. Computer
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.5.c.1. eMeeting
Rationale:
Our eMeeting training was held August 19, and the new system will be used for committee meetings and board meetings from now on.
The Directors Download page will remain active for documents & information unrelated to board meetings. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6. RURAL WATER SYSTEMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.a. Bruno / David City Rural Water System
Rationale:
Coliform samples will be taken on August 28th, sample results will be known by board meeting.
With recent storms, some erosion has occurred along the trench of the pipeline, staff will be working to fill these washouts in before winter. A pile of dirt at Homestead Lake will provide the soil needed for the work to be completed. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.b. Colon / Wahoo Rural Water System
Rationale:
Coliform samples will be taken on August 28th, sample results will be known by board meeting. Six Colon customers have been sent disconnection notices and staff will be visiting these people closer to the 10th of the month. Staff shut water service off to a non-paying customer in Colon. Payment schedule has been discussed with customers but no payment has yet been received.Mary Wirka has met the requirements to have her deposit returned back to her. Staff will return her $100 deposit.
Recommended Motion(s):
*Return $100 deposit to Mary Wirka per Rural Water policy Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.c. Cedar Bluffs
Rationale:
No new developments. Cedar Bluff is currently testing various pumping regiments to determine if it affects arsenic levels in water.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.d. Brainard and Dwight
Rationale:
No new developments. Staff from the Village of Brainard and Dwight are currently testing irrigation wells to determine water quality in the area for possible development of a shared well field.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.6.e. Other
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.B.7. Adjournment
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C. Water Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1. REGULATORY
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a. GROUND WATER MANAGEMENT AREA
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.1. 2014 Well Interference Complaints
Rationale:
Recommended Motion(s):
Explore the LPNNRD declaration of Section 3, T15N, R8E and the surrounding sections as a Special Quantity Subarea within our Ground Water Management Rules & Regulations Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.2. Irrigated Acres for 2015 in HCA and NHCA
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.3. Variance Request in the Hydrologically Connected Area (Limited Development Area)
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.4. Variance Requests in the Non-Hydrologically Connected Area (Normal Development Area)
Rationale:
Recommended Motion(s):
Award a total of 415.2 acres for the year 2015 in the Non-hydrologically Connected Area of the Lower Platte North NRD Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.5. Variance Requests in the Restricted Development Areas
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.6. Well Permit Program
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.6.A. Well Permits Approved
Rationale:
Four new Well Permits have been approved:
The total number of approved permits for 2014 is 62. Location of Approved Well Permits by County for 2014: Correct as of 8/27/2014
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.6.B. Supplemental Well Permit for Line Rider LLC
Rationale:
Line Rider LLC is requesting a supplemental well for their ground in the N½ of the NE¼ in Section 21-T18N-R6E in Dodge County (North Bend Subarea). The ground is currently irrigated by a well in the S½ of the the same ¼ but, due to a change in ownership, they would like to drill their own well and install their own pivot. The test hole is attached.
Recommended Motion(s):
* Approve the supplemental well in the N½ of the NE¼ in Section 21-T18N-R6E in Dodge County (North Bend Subarea) for Line Rider LLC Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.6.C. Buhman Replacement Well Permit
Rationale:
Phil Buhman is requesting a replacement well in the NW¼ of the NW¼ in Section 2-T18N-R1E in Platte County. They believe that they are having well construction issues and would like to replace the existing well. This is the first replacement well inside of a Special Quantity Subarea. The well currently irrigates 108 acres. Since this is a replacement well is was approved by staff. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.7. Irrigation Runoff Complaint
Rationale:
On August 22nd Russ Oaklund investigated a complaint of an end gun watering a county road. This water was from a pivot located in the SW1/4, Section 36, T15N, R4E owned by Duane Ratkovec. When Russ arrived the end gun had been turned off and he talked briefly with Mr. Ratkovec.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.8. Potential Violation of Expanded Irrigation
Rationale:
An initial complaint noted irrigation from end guns on land owned by Liberty Land & Livestock LLC that exceeded the approved number of acres. Following action by the Board on August 11, 2014 a Cease & Desist Order was mailed to Liberty Livestock on August 13th, which they received on August 15, 2014. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.9. Special Quantity Subareas
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.9.A. Special Quantity Subareas - NET Grant
Rationale:
Staff have been working on submitting a NET grant request, which is due September 5, 2014. We may not know the final outcome of our grant request until February or March of 2015. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.9.B. Special Quantity Subareas - Approved Flow Meters
Rationale:
Staff is reviewing our current list of approved flow meters and will likely need to make some modifications. For example, it appears Seimens no longer makes propeller meters and has switched to ultrasonic and electromagnetic meters. See attachment.
Recommended Motion(s):
Accept the flow meters and required conditions as listed on the attachment as approved flow meters by the Lower Platte North NRD Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.9.C. Special Quantity Subareas - Water Allocation for 2015
Rationale:
Allocation for 2015 will need to be discussed and set before December 15, 2014. If the Board does not set the allocation by that date, the default rolling allocation will be 27 acre inches for a three year period. This allocation will first take effect in the Butler-Saunders SQS in 2015, and take effect in the Platte-Colfax SQS in 2016.
Recommended Motion(s):
Set the water allocation in the Special Quantity Subareas for 2015 at 27 acre inches over a three year period Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.10. Lower Platte River Basin Water Management Plan Coalition (LPRBWMPC)
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.11. Voluntary Integrated Water Management Plan - LENRD and LPNNRD
Rationale:
Recommended Motion(s):
Approve payment to Olsson Associates of $12,446.39 for services rendered in development of the District's Voluntary Integrated Water Management Plan Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.12. Cost Share Programs
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.12.A. Irrigation Well Sample Kits
Rationale:
338 kits have been requested and sent out (43 of these have been requested earlier the week of August 25 - 26, 2014). The results from 136 of these kits have been received from HHS/Lincoln with a range of 0.00 to 33.0 ppm. Thirty water samples were received on August 26th and 48 more on August 27, 2015. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.12.B. Domestic Well Sample Kits
Rationale:
Seven kits have been requested and these were mailed out. The results from four of these kits has been received and the results have been mailed to the well owner. This cost-share program is available only in the Phase 2 areas.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.13. LPNNRD Certification
Rationale:
No new on-line test requests since the last committee meeting. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.14. Certifying Acres in Saunders and Dodge Counties
Rationale:
Recommended Motion(s):
Allow Brian Sanderson to place a Corner Unit due to grandfathering and irrigate the field in the NW ¼, Section 14, T16N, R7E (see attached map) Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.15. Bellwood Phase 2 Area
Rationale:
2014 is the twelfth year of this Phase 2 Area. 39 producer sample results have been received (range of 0.93 to 21.6 ppm).
32 of these sample results were received the day of the Water Committee meeting. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.a.16. Richland-Schuyler Phase 2 Area
Rationale:
2014 is the eleventh year of this Phase 2 Area. 97 producer sample results have been received (range of 2.37 to 33.0).
35 of these sample results were received the day of the Water Committee. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.b. CHEMIGATION
Rationale:
For 2014 we have 381 renewals and 84 new permit applications for a current total of 465. Due to weather and landowner delays, inspections are still ongoing.
Summer chemigation inspections are listed below:
The breakdown, by county for the 84 chemigation permit applications, are listed below.
The fee structure for chemigation systems has been the same since 1987. A time is being reserved at the fall NARD conference for NRD's to discuss this general fee structure. At the July 23rd meeting the consensus of the attending NRD's was to keep the new fees essentially uniform across the State, whatever that final amount will be.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.1.c. LIVESTOCK WASTE PERMITS
Rationale:
No new livestock permit applications have been received from DEQ. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2. GROUND WATER PROGRAMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a. DECOMMISSIONED WELL PROGRAM
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.1. Well Estimates
Rationale:
Four new wells have been reviewed and approved by Gottschalk for decommissioning since the last Committee meeting.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.a.2. Plugged Wells
Rationale:
No wells are ready for cost share payment this month. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.b. LOWER PLATTE NORTH NRD GROUND WATER STUDIES
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.b.1. Elkhorn Loup Model (ELM)
Rationale:
Recommended Motion(s):
Approve payment of $5,000 to Lower Loup NRD for special training by USGS in the use and interpretation of the ELM model Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.b.2. Eastern Nebraska Water Resources Assessment (ENWRA)
Rationale:
Katie Cameron (ENWRA coordinator) is asking members of the Technical Committee to review the ENWRA application for an NET grant. The due date is August 29, 2014. The northern half of the ENWRA flightlines over eastern Nebraska maybe delayed until the Spring of 2015. Scheduling conflicts with the helicopter company is part of the problem. LENRD had made earlier arrangements to fly a portion of their District this fall and it looks like those will be flown as scheduled. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.c. GROUND WATER ENERGY LEVELS
Rationale:
The summer readings for the monitoring wells owned by the multi-agencies in the Wann Basin subarea and near the Former Ordnance plant near Mead were measured on August 26, 2014. This data is used in the ground water modeling efforts of MUD, LWS, and the USACE.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.2.d. GROUND WATER SAMPLING
Rationale:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3. SURFACE WATER PROGRAMS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.a. STATE LAKES, FOR THE WEEK OF
Rationale:
Lake Wanahoo will be added to DEQ sampling list for area lakes.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.a.1. Bacteria Sampling
Rationale:
One Lake tested high for E. coli bacteria this week. E. coli levels measured above 235 colonies/100 ml of sample are considered a higher risk for illness when swimming. Considering the more rapid changes in bacteria conditions, signs are not posted with these higher levels although DEQ wants people to be aware and use their own judgment on their use.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.3.a.2. Toxic Algae
Rationale:
Three Lakes will be on “Health Alert” this week. It is DEQ policy that any lake that has microcystin levels over the established criterion of 20 ppb will be placed on “Health Alert” Status until such time that it has tested below 20 ppb for two continuous weeks. If a lake is under a Health Alert, signs will be posted recommending people avoid full body contact activities such as swimming, wading, skiing, jet skiing, etc. Non-contact activities such as boating, fishing, and camping are OK.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.4. OTHER
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.4.a. 2014 SUMMER INTERNS
Rationale:
Interns have ended their summer employment with the Lower Platte North NRD and have returned to UNL.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.C.4.b. COMMENTS FROM THE PUBLIC
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D. Projects Committee - Action as Required
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.1. SWCP
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.1.a. SWCP Approvals
Rationale:
SWCP Approvals: 50% 75%
BRT Farms Saunders Flow Meter $625.00 Don Yindrick Butler (Skull Cr.) Terraces/Tile/Basins $12,500.00 Gary Vandenberg Butler Flow Meter $625.00 Daryl Glodowski Colfax Terraces/Tile $12,500.00 Robert Schmit Butler Planned Grazing(EQIP) $340.83 (14%) Gary Mintken Dodge Diversion/Waterway $2,712.20 (complete project approved last year)
Recommended Motion(s):
*Approve the SWCP Approval as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.1.b. SWCP Payments
Rationale:
SWCP Payments: 15% 50% 75%
Raymond Sedlacek Terraces/Tile (w/EQIP) $ 1,548.57
Recommended Motion(s):
*Approve the SWCP Payments as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.1.c. Sand & Duck Creek Payments
Rationale:
Raymond Sedlacek Terraces/Tile (w/EQIP) $ 2,576.19
Recommended Motion(s):
*Approve the Sand and Duck Creek Payments as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.1.d. Cottonwood Creek Payments
Rationale:
Richard and Robert Paseka Terraces/Tile (w/EQIP) $ 12,500
Recommended Motion(s):
*Approve the Cottonwood Creek Payments as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.1.e. Wahoo Creek Watershed Payment
Rationale:
Richard and Robert Paseka Lands for Conservation 100 acres $ 22,000
Recommended Motion(s):
*Approve the Wahoo Creek Watershed Payment as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2. WATERSHEDS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.a. Shell Creek Grant Applications - 8:30 a.m.
Rationale:
Last month, the Board approved an agreement with EA Engineering to complete EPA 319 and Environmental Trust grant applications for the Shell Creek Watershed. Dan Bigbee and Jamie Suing, EA Engineering, were present to review draft applications and answer questions.
Recommended Motion(s):
*To approve the Shell Creek Grant application to NDEQ (EPA 319) and the Nebraska Environmental Trust and appoint Assistant Manager Mountford as the grant administrator and authorize him to sign the grant applications and all other required documents for the grants as attached to the Projects Committee Minutes. Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.b. Shell Creek Watershed Plan Update
Rationale:
The Shell Creek Watershed Water Quality Plan draft is complete and being reviewed by NDEQ, SWIG & LPNNRD. An open house to present the plan for public input will be 5:30 - 7:30 p.m. at the Platte Center Auditorium on September 18, 2014.
Recommended Motion(s):
Approve the $31,057.50 invoice from EA Engineering as attached Passed with a motion by Board Member #1 and a second by Board Member #2.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.c. Shell Creek Landowner Levee Project Update
Rationale:
Director Bailey reported that the engineer is working on the no-rise certificate that is required by the City of Schuyler before they can proceed with the project.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.2.d. Wahoo Creek Watershed - Water Quality Plan Phase I
Rationale:
JEO has began work on Phase I of the Wahoo Water Quality Plan that include a detailed analysis of the Wahoo Creek Watershed priority sub-basins and land treatment practices. If an invoice is received from JEO for work completed by the Board Meeting, a motion to pay will be requested.
Recommended Motion(s):
Approve an invoice from JEO in the amount of $1,250 for work completed on the Wahoo Creek Water Quality Plan - Phase I Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3. LOWER PLATTE RIVER CORRIDOR ALLIANCE
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.3.a. LPRCA Monthly Report
Rationale:
Meghan Sittler's July LPRCA report is attached. Her August report will be attached by Board Meeting.
Attachments:
(
)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4. OTHER
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.a. Army COE 205 Projects
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.a.1. Fremont 205
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.a.2. Schuyler 205
Rationale:
The project is 65% complete overall. A new construction deadline has been extended to October 15th due to weather related delays. Some of the delays are due to area landowners and irrigation runoff from fields adjacent to construction area.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.b. Shell Creek Landowner Levee Project Update
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.c. All Hazard Mitigation Plan Update- JEO Progress Report and Invoice
Rationale:
JEO is working on community follow-up for completing our Hazard Mitigation Plan. Dates for public meetings are tentatively scheduled for October 9, 14 & 16.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.d. Platte County/Mark Luchinger Grade Stabilization Project Update
Rationale:
Mountford and Heimann met with with Platte County on August 22 to discuss a potential grade stabilization project on landowner Mark Luchinger's property. The County is replacing a bridge with three 9 foot culverts at this location and the landowner desires that the County and LPNNRD work with him to stabilize an eroding drainage on his property. The County will be discussing this topic in the near future.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.4.e. Review of Projects Financial Statement
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5. SAND CREEK ENVIRONMENTAL RESTORATION PROJECT REPORT
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5.a. Lake Wanahoo
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5.a.1. County Road 17 Paving/Entrance to Wanahoo
Rationale:
Bids were opened by the County on August 26th and ME Collins was low bid for paving County Road 17. The County will approve and award the bid at their September 2nd meeting.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5.a.2. Income and Expense Lake Wanahoo
Rationale:
Attached find income and expense summaries from Game and Parks and the NRD's monthly expense summary.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5.a.3. Lake Wanahoo Trails
Rationale:
The City of Wahoo is recommending a resolution to authorize Mayor to sign documents for federal assistance for development of the Lake Wanahoo Trails Project - Phase II.
Recommended Motion(s):
*That the NRD write a letter of support for City of Wahoo and their trails project, Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5.a.4. Hwy 77 Bypass Project
Rationale:
Work on the dam road will begin on September 8th. Staff has allowed the Contractor, Constructors Inc. a small area on the West side of the dam to store millings and supplies for the roadway in exchange for the rock surfacing to be stockpiled for future use within the Park.
Recommended Motion(s):
A motion will be needed at Board Meeting to approve the Property Lease Agreement with Constructors Inc. as attached to the Projects Committee Minutes. Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.5.b. Upstream Structures
Rationale:
All dams are full and functioning as designed. Staff is looking into fall spraying and seeding on some areas.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.6. WESTERN SARPY/CLEAR CREEK LEVEE REPORT
Rationale:
Segment 4B of the Western Sarpy/Clear Creek Project was awarded to Klocke Inc. of Palmyra, MO with a bid of $2,894,834. Contractor has mobilized, started clearing and grubbing trees and placement of fill within the area.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6.D.7. ADJOURNMENT
Discussion:
With no further business, the Projects Committee Meeting adjourned at 10:00 a.m.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7. Additional Action Items
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7.A. SWCP Payments
Rationale:
14-B-33 Robert Schmit W/S Basins $4,065.57
Recommended Motion(s):
Motion to approve that following SWCP Payments Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8. Approval of Bills Pending
Recommended Motion(s):
Approve bills pending as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9. Consent Agenda Adoption
Recommended Motion(s):
Approve Consent Agenda as presented Passed with a motion by Board Member #1 and a second by Board Member #2.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10. Comments from Directors/Guests
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11. Meeting Establishment/Adjournment
Rationale:
NOTE: The agenda is on file at the LPNNRD office and may be changed up to 24 hours prior to the meeting as scheduled. |